  Page 1                                    Tue Mar 19 19:10:48 2024

  ******************************************************************
  *                           E P A N E T                          *
  *                   Hydraulic and Water Quality                  *
  *                   Analysis for Pipe Networks                   *
  *                         Version 2.2                            *
  ******************************************************************
  
  Analysis begun Tue Mar 19 19:10:48 2024

   
  Hydraulic Status:
  -----------------------------------------------------------------------
     0:00:00: Pump ~@Pump-9 changed by Tank T-4 control
     0:00:00: Balancing the network:

              Trial  1: relative flow change = 53.169223
              PRV ~@RV-4 switched from active to closed
              Trial  2: relative flow change = 0.658903
              PRV ~@RV-1 switched from active to closed
              PRV ~@RV-4 switched from closed to active
              PRV ~@RV-5 switched from active to open
              Trial  3: relative flow change = 0.266258
              PRV ~@RV-5 switched from open to active
              Trial  4: relative flow change = 0.105494
              PRV ~@RV-4 switched from active to open
              Trial  5: relative flow change = 0.041299
              PRV ~@RV-4 switched from open to active
              Trial  6: relative flow change = 0.015220
              Trial  7: relative flow change = 0.024556
              Trial  8: relative flow change = 0.001297
              Trial  9: relative flow change = 0.000191
              Trial 10: relative flow change = 0.000005
                        maximum  flow change = 0.4383 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link P-452

     0:00:00: Balanced after 10 trials
     0:00:00: Reservoir R-1 is filling
     0:00:00: Reservoir R-2 is emptying
     0:00:00: Tank T-1 is filling at 140.78 ft
     0:00:00: Tank T-10 is emptying at 179.16 ft
     0:00:00: Tank T-11 is filling at 101.61 ft
     0:00:00: Tank T-12 is filling at 158.36 ft
     0:00:00: Tank T-13 is filling at 70.48 ft
     0:00:00: Tank T-2 is filling at 82.67 ft
     0:00:00: Tank T-3 is emptying at 67.79 ft
     0:00:00: Tank T-4 is emptying at 84.61 ft
     0:00:00: Tank T-5 is filling at 134.36 ft
     0:00:00: Tank T-6 is filling at 102.72 ft
     0:00:00: Tank T-7 is emptying at 142.29 ft
     0:00:00: Tank T-8 is filling at 121.77 ft
     0:00:00: Tank T-9 is emptying at 148.59 ft
     0:00:00: Pump ~@Pump-9 closed
     0:00:00: PRV ~@RV-1 closed
   
     0:32:22: Balancing the network:

              Trial  1: relative flow change = 0.107109
              Trial  2: relative flow change = 0.058159
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.043777
              Trial  4: relative flow change = 0.006881
              Trial  5: relative flow change = 0.000434
              Trial  6: relative flow change = 0.000004
                        maximum  flow change = 0.2821 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     0:32:22: Balanced after 6 trials
     0:32:22: Tank T-12 is closed at 158.49 ft
     0:32:22: Tank T-8 is emptying at 130.27 ft
     0:32:22: Tank T-9 is filling at 133.59 ft
     0:32:22: Pipe P-1 changed from open to temporarily closed
   
     1:00:00: Balancing the network:

              Trial  1: relative flow change = 0.095749
              Trial  2: relative flow change = 0.079867
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.079281
              Trial  4: relative flow change = 0.021572
              Trial  5: relative flow change = 0.003634
              Trial  6: relative flow change = 0.000222
              Trial  7: relative flow change = 0.000001
                        maximum  flow change = 0.1049 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     1:00:00: Balanced after 7 trials
     1:00:00: Tank T-12 is filling at 158.49 ft
     1:00:00: Tank T-8 is filling at 124.93 ft
     1:00:00: Tank T-9 is emptying at 142.62 ft
     1:00:00: Pipe P-1 changed from temporarily closed to open
   
     1:31:36: Balancing the network:

              Trial  1: relative flow change = 0.110954
              Trial  2: relative flow change = 0.051175
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.055616
              Trial  4: relative flow change = 0.007874
              Trial  5: relative flow change = 0.000541
              Trial  6: relative flow change = 0.000006
                        maximum  flow change = 0.2159 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     1:31:36: Balanced after 6 trials
     1:31:36: Tank T-8 is emptying at 129.93 ft
     1:31:36: Tank T-9 is filling at 133.59 ft
     1:31:36: Pipe P-1 changed from open to temporarily closed
   
     2:00:00: Balancing the network:

              Trial  1: relative flow change = 0.105524
              Trial  2: relative flow change = 0.158963
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.140122
              Trial  4: relative flow change = 0.054236
              Trial  5: relative flow change = 0.015602
              Trial  6: relative flow change = 0.003122
              Trial  7: relative flow change = 0.000152
              Trial  8: relative flow change = 0.000001
                        maximum  flow change = 0.0358 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     2:00:00: Balanced after 8 trials
     2:00:00: Tank T-8 is filling at 124.56 ft
     2:00:00: Tank T-9 is emptying at 142.67 ft
     2:00:00: Pipe P-1 changed from temporarily closed to open
   
     2:13:17: Balancing the network:

              Trial  1: relative flow change = 0.050854
              Trial  2: relative flow change = 0.008092
              Pipe P-1030 switched from open to closed
              Trial  3: relative flow change = 0.014211
              Trial  4: relative flow change = 0.002889
              Trial  5: relative flow change = 0.000340
              Trial  6: relative flow change = 0.000008
                        maximum  flow change = 0.0315 for Link P-1031
                        maximum  head error  = 0.0000 for Link P-645

     2:13:17: Balanced after 6 trials
     2:13:17: Tank T-10 is filling at 177.68 ft
     2:13:17: Tank T-11 is closed at 106.61 ft
     2:13:17: Pipe P-1030 changed from open to temporarily closed
   
     2:19:58: Pump ~@Pump-13 changed by Tank T-1 control
     2:19:58: Balancing the network:

              Trial  1: relative flow change = 0.070744
              Trial  2: relative flow change = 0.015803
              Trial  3: relative flow change = 0.004456
              Trial  4: relative flow change = 0.000600
              Trial  5: relative flow change = 0.000052
                        maximum  flow change = 4.0825 for Link ~@Pump-13
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     2:19:58: Balanced after 5 trials
     2:19:58: Tank T-1 is emptying at 143.78 ft
     2:19:58: Tank T-8 is emptying at 126.88 ft
     2:19:58: Tank T-9 is filling at 138.34 ft
     2:19:58: Pump ~@Pump-13 changed from open to closed
   
     2:42:06: Balancing the network:

              Trial  1: relative flow change = 0.078000
              Trial  2: relative flow change = 0.006620
              Pipe P-10 switched from open to closed
              Trial  3: relative flow change = 0.007022
              PRV ~@RV-2 switched from active to open
              Trial  4: relative flow change = 0.026226
              PRV ~@RV-2 switched from open to active
              Trial  5: relative flow change = 0.000706
              Trial  6: relative flow change = 0.000007
                        maximum  flow change = 0.0755 for Link P-867
                        maximum  head error  = 0.0000 for Link P-85

     2:42:06: Balanced after 6 trials
     2:42:06: Tank T-3 is closed at 61.79 ft
     2:42:06: Tank T-8 is filling at 126.10 ft
     2:42:06: Tank T-9 is emptying at 139.27 ft
     2:42:06: Pipe P-10 changed from open to temporarily closed
   
     3:00:00: Balancing the network:

              Trial  1: relative flow change = 0.071021
              Trial  2: relative flow change = 0.021941
              Trial  3: relative flow change = 0.006916
              Trial  4: relative flow change = 0.000974
              Trial  5: relative flow change = 0.000021
                        maximum  flow change = 1.6877 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     3:00:00: Balanced after 5 trials
     3:00:00: Tank T-8 is emptying at 127.38 ft
     3:00:00: Tank T-9 is filling at 136.76 ft
   
     3:29:28: Balancing the network:

              Trial  1: relative flow change = 0.128885
              Trial  2: relative flow change = 0.034137
              Pipe P-596 switched from open to closed
              Trial  3: relative flow change = 0.382797
              Trial  4: relative flow change = 0.062182
              Trial  5: relative flow change = 0.005682
              Trial  6: relative flow change = 0.000371
              Trial  7: relative flow change = 0.000006
                        maximum  flow change = 0.0175 for Link P-370
                        maximum  head error  = 0.0000 for Link P-370

     3:29:28: Balanced after 7 trials
     3:29:28: Tank T-2 is closed at 97.67 ft
     3:29:28: Tank T-8 is filling at 124.47 ft
     3:29:28: Tank T-9 is emptying at 141.14 ft
     3:29:28: Pipe P-596 changed from open to temporarily closed
   
     3:58:05: Balancing the network:

              Trial  1: relative flow change = 0.142588
              Trial  2: relative flow change = 0.081793
              Trial  3: relative flow change = 0.032269
              Trial  4: relative flow change = 0.007733
              Trial  5: relative flow change = 0.000543
              Trial  6: relative flow change = 0.000003
                        maximum  flow change = 0.1694 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     3:58:05: Balanced after 6 trials
     3:58:05: Tank T-8 is emptying at 128.56 ft
     3:58:05: Tank T-9 is filling at 133.60 ft
   
     3:58:15: Balancing the network:

              Trial  1: relative flow change = 0.000846
              Trial  2: relative flow change = 0.000006
                        maximum  flow change = 0.0404 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-10

              Pipe P-678 switched from open to closed
              Trial  3: relative flow change = 0.257541
              Trial  4: relative flow change = 0.040429
              Trial  5: relative flow change = 0.004938
              Trial  6: relative flow change = 0.000229
              Trial  7: relative flow change = 0.000003
                        maximum  flow change = 0.0107 for Link P-593
                        maximum  head error  = 0.0000 for Link P-593

     3:58:15: Balanced after 7 trials
     3:58:15: Tank T-7 is closed at 117.29 ft
     3:58:15: Pipe P-678 changed from open to temporarily closed
   
     4:00:00: Balancing the network:

              Trial  1: relative flow change = 0.020472
              Trial  2: relative flow change = 0.004624
              Trial  3: relative flow change = 0.000722
              Trial  4: relative flow change = 0.000005
                        maximum  flow change = 0.0070 for Link P-783
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     4:00:00: Balanced after 4 trials
   
     5:00:00: Balancing the network:

              Trial  1: relative flow change = 0.196163
              Trial  2: relative flow change = 0.049854
              Trial  3: relative flow change = 0.008360
              Trial  4: relative flow change = 0.000345
              Trial  5: relative flow change = 0.000020
                        maximum  flow change = 0.2061 for Link P-562
                        maximum  head error  = 0.0000 for Link P-562

     5:00:00: Balanced after 5 trials
     5:00:00: Tank T-8 is filling at 118.67 ft
     5:00:00: Tank T-9 is emptying at 149.01 ft
   
     5:28:57: Balancing the network:

              Trial  1: relative flow change = 0.181770
              Trial  2: relative flow change = 0.084623
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.172822
              Trial  4: relative flow change = 0.024552
              Trial  5: relative flow change = 0.001872
              Trial  6: relative flow change = 0.000039
                        maximum  flow change = 0.0435 for Link P-394
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     5:28:57: Balanced after 6 trials
     5:28:57: Tank T-12 is emptying at 159.67 ft
     5:28:57: Tank T-8 is emptying at 127.19 ft
     5:28:57: Tank T-9 is filling at 133.59 ft
     5:28:57: Pipe P-1 changed from open to temporarily closed
   
     6:00:00: Balancing the network:

              Trial  1: relative flow change = 0.139388
              Trial  2: relative flow change = 0.108791
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.230828
              Trial  4: relative flow change = 0.064381
              Trial  5: relative flow change = 0.007726
              Trial  6: relative flow change = 0.000396
              Trial  7: relative flow change = 0.000018
                        maximum  flow change = 0.1084 for Link P-347
                        maximum  head error  = 0.0000 for Link P-347

     6:00:00: Balanced after 7 trials
     6:00:00: Tank T-8 is filling at 122.48 ft
     6:00:00: Tank T-9 is emptying at 141.55 ft
     6:00:00: Pipe P-1 changed from temporarily closed to open
   
     6:24:10: Balancing the network:

              Trial  1: relative flow change = 0.120292
              Trial  2: relative flow change = 0.155951
              Trial  3: relative flow change = 0.076070
              Trial  4: relative flow change = 0.029620
              Trial  5: relative flow change = 0.006893
              Trial  6: relative flow change = 0.000439
              Trial  7: relative flow change = 0.000002
                        maximum  flow change = 0.0925 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     6:24:10: Balanced after 7 trials
     6:24:10: Tank T-8 is emptying at 126.77 ft
     6:24:10: Tank T-9 is filling at 133.60 ft
   
     6:54:59: Pump ~@Pump-8 changed by Tank T-13 control
     6:54:59: Balancing the network:

              Trial  1: relative flow change = 0.156679
              Trial  2: relative flow change = 0.249331
              CV P-75 switched from open to closed
              Trial  3: relative flow change = 0.085236
              PRV ~@RV-5 switched from active to closed
              Trial  4: relative flow change = 0.021403
              Trial  5: relative flow change = 0.002166
              Trial  6: relative flow change = 0.000033
                        maximum  flow change = 0.9298 for Link P-948
                        maximum  head error  = 45.3364 for Link ~@Pump-10

     6:54:59: Balanced after 6 trials
     6:54:59: Tank T-12 is filling at 159.34 ft
     6:54:59: Tank T-13 is emptying at 90.48 ft
     6:54:59: Tank T-8 is filling at 122.30 ft
     6:54:59: Tank T-9 is emptying at 140.48 ft
     6:54:59: CV P-75 changed from open to closed
     6:54:59: Pump ~@Pump-8 changed from open to closed
     6:54:59: PRV ~@RV-5 changed from active to closed
   
     7:00:00: Balancing the network:

              Trial  1: relative flow change = 0.186786
              Trial  2: relative flow change = 0.050736
              Trial  3: relative flow change = 0.007346
              Trial  4: relative flow change = 0.000138
              Trial  5: relative flow change = 0.000001
                        maximum  flow change = 0.0010 for Link P-89
                        maximum  head error  = 40.3756 for Link ~@Pump-10

     7:00:00: Balanced after 5 trials
     7:00:00: Tank T-12 is emptying at 159.35 ft
   
     7:21:55: Balancing the network:

              Trial  1: relative flow change = 0.097885
              Trial  2: relative flow change = 0.154766
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.254418
              Trial  4: relative flow change = 0.061973
              Trial  5: relative flow change = 0.011228
              Trial  6: relative flow change = 0.000741
              Trial  7: relative flow change = 0.000007
                        maximum  flow change = 0.1902 for Link P-948
                        maximum  head error  = 37.1376 for Link ~@Pump-10

     7:21:55: Balanced after 7 trials
     7:21:55: Tank T-10 is closed at 179.73 ft
     7:21:55: Tank T-6 is emptying at 130.22 ft
     7:21:55: Tank T-8 is emptying at 125.95 ft
     7:21:55: Tank T-9 is filling at 133.59 ft
     7:21:55: Pipe P-1 changed from open to temporarily closed
   
     8:00:00: Balancing the network:

              Trial  1: relative flow change = 0.215271
              PRV ~@RV-2 switched from active to open
              Trial  2: relative flow change = 0.078372
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.248714
              Trial  4: relative flow change = 0.067828
              Trial  5: relative flow change = 0.010294
              Trial  6: relative flow change = 0.001188
              Trial  7: relative flow change = 0.000055
                        maximum  flow change = 0.1249 for Link P-70
                        maximum  head error  = 36.6901 for Link ~@Pump-10

     8:00:00: Balanced after 7 trials
     8:00:00: Tank T-10 is emptying at 179.73 ft
     8:00:00: Tank T-5 is emptying at 136.69 ft
     8:00:00: Tank T-6 is filling at 130.18 ft
     8:00:00: Tank T-8 is filling at 120.93 ft
     8:00:00: Tank T-9 is emptying at 142.07 ft
     8:00:00: Pipe P-1 changed from temporarily closed to open
     8:00:00: PRV ~@RV-2 changed from active to open
   
     8:04:56: Pump ~@Pump-9 changed by Tank T-4 control
     8:04:56: Balancing the network:

              Trial  1: relative flow change = 0.045845
              Trial  2: relative flow change = 0.091534
              Trial  3: relative flow change = 0.038124
              Trial  4: relative flow change = 0.004975
              Trial  5: relative flow change = 0.000026
                        maximum  flow change = 0.0313 for Link P-667
                        maximum  head error  = 36.7578 for Link ~@Pump-10

     8:04:56: Balanced after 5 trials
     8:04:56: Tank T-4 is filling at 79.61 ft
     8:04:56: Pump ~@Pump-9 changed from closed to open
   
     8:26:05: Balancing the network:

              Trial  1: relative flow change = 0.105155
              Trial  2: relative flow change = 0.090164
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.211771
              Trial  4: relative flow change = 0.040362
              Trial  5: relative flow change = 0.004959
              Trial  6: relative flow change = 0.000225
              Trial  7: relative flow change = 0.000005
                        maximum  flow change = 0.0175 for Link P-45
                        maximum  head error  = 33.0453 for Link ~@Pump-10

     8:26:05: Balanced after 7 trials
     8:26:05: Tank T-6 is emptying at 130.29 ft
     8:26:05: Tank T-8 is emptying at 125.46 ft
     8:26:05: Tank T-9 is filling at 133.59 ft
     8:26:05: Pipe P-1 changed from open to temporarily closed
   
     9:00:00: Balancing the network:

              Trial  1: relative flow change = 0.101024
              Trial  2: relative flow change = 0.049181
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.235377
              Trial  4: relative flow change = 0.063751
              Trial  5: relative flow change = 0.011074
              Trial  6: relative flow change = 0.000974
              Trial  7: relative flow change = 0.000055
                        maximum  flow change = 0.2822 for Link P-722
                        maximum  head error  = 35.1937 for Link ~@Pump-10

     9:00:00: Balanced after 7 trials
     9:00:00: Tank T-6 is filling at 129.80 ft
     9:00:00: Tank T-8 is filling at 121.28 ft
     9:00:00: Tank T-9 is emptying at 140.65 ft
     9:00:00: Pipe P-1 changed from temporarily closed to open
   
     9:20:47: Balancing the network:

              Trial  1: relative flow change = 0.108431
              Trial  2: relative flow change = 0.064579
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.199302
              Trial  4: relative flow change = 0.029883
              Trial  5: relative flow change = 0.002941
              Trial  6: relative flow change = 0.000094
                        maximum  flow change = 0.1567 for Link P-36
                        maximum  head error  = 31.4814 for Link ~@Pump-10

     9:20:47: Balanced after 6 trials
     9:20:47: Tank T-6 is emptying at 129.81 ft
     9:20:47: Tank T-8 is emptying at 125.05 ft
     9:20:47: Tank T-9 is filling at 133.59 ft
     9:20:47: Pipe P-1 changed from open to temporarily closed
   
    10:00:00: Balancing the network:

              Trial  1: relative flow change = 0.080250
              Trial  2: relative flow change = 0.031407
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.234146
              Trial  4: relative flow change = 0.065756
              Trial  5: relative flow change = 0.012774
              Trial  6: relative flow change = 0.001200
              Trial  7: relative flow change = 0.000073
                        maximum  flow change = 0.1407 for Link P-974
                        maximum  head error  = 34.6231 for Link ~@Pump-10

    10:00:00: Balanced after 7 trials
    10:00:00: Tank T-8 is filling at 120.52 ft
    10:00:00: Tank T-9 is emptying at 141.25 ft
    10:00:00: Pipe P-1 changed from temporarily closed to open
   
    10:20:41: Balancing the network:

              Trial  1: relative flow change = 0.114756
              Trial  2: relative flow change = 0.053260
              Trial  3: relative flow change = 0.014295
              Trial  4: relative flow change = 0.002182
              Trial  5: relative flow change = 0.000057
                        maximum  flow change = 2.7825 for Link P-948
                        maximum  head error  = 34.0090 for Link ~@Pump-10

    10:20:41: Balanced after 5 trials
    10:20:41: Tank T-8 is emptying at 124.62 ft
    10:20:41: Tank T-9 is filling at 133.60 ft
   
    10:40:29: Pump ~@Pump-8 changed by Tank T-13 control
    10:40:29: Balancing the network:

              Trial  1: relative flow change = 0.135431
              PRV ~@RV-5 switched from closed to open
              Trial  2: relative flow change = 0.284342
              CV P-75 switched from closed to open
              Trial  3: relative flow change = 0.172684
              Trial  4: relative flow change = 0.083987
              Trial  5: relative flow change = 0.036923
              Trial  6: relative flow change = 0.012545
              Trial  7: relative flow change = 0.002053
              Trial  8: relative flow change = 0.000115
              Trial  9: relative flow change = 0.000115
              Trial 10: relative flow change = 0.000230
              Trial 11: relative flow change = 0.000459
              Trial 12: relative flow change = 0.000922
              Trial 13: relative flow change = 0.001854
              Trial 14: relative flow change = 0.003748
              Trial 15: relative flow change = 0.007636
              Trial 16: relative flow change = 0.015704
              Trial 17: relative flow change = 0.031957
              Trial 18: relative flow change = 0.056957
              Trial 19: relative flow change = 0.059098
              Trial 20: relative flow change = 0.017811
              PRV ~@RV-5 switched from open to active
              Trial 21: relative flow change = 0.001877
              Trial 22: relative flow change = 0.003028
              Trial 23: relative flow change = 0.000123
              Trial 24: relative flow change = 0.000000
                        maximum  flow change = 0.0005 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-10

    10:40:29: Balanced after 24 trials
    10:40:29: Tank T-8 is filling at 122.50 ft
    10:40:29: Tank T-9 is emptying at 136.63 ft
    10:40:29: CV P-75 changed from closed to open
    10:40:29: Pump ~@Pump-8 changed from closed to open
    10:40:29: PRV ~@RV-5 changed from closed to active
   
    10:55:56: Balancing the network:

              Trial  1: relative flow change = 0.046347
              Trial  2: relative flow change = 0.136604
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.258060
              Trial  4: relative flow change = 0.050515
              PRV ~@RV-5 switched from active to open
              Trial  5: relative flow change = 0.012836
              Trial  6: relative flow change = 0.002111
              Trial  7: relative flow change = 0.000118
              Trial  8: relative flow change = 0.000004
                        maximum  flow change = 0.0553 for Link P-622
                        maximum  head error  = 0.0000 for Link P-622

    10:55:56: Balanced after 8 trials
    10:55:56: Tank T-8 is emptying at 123.98 ft
    10:55:56: Tank T-9 is filling at 133.59 ft
    10:55:56: Pipe P-1 changed from open to temporarily closed
    10:55:56: PRV ~@RV-5 changed from active to open
   
    11:00:00: Balancing the network:

              Trial  1: relative flow change = 0.006215
              Trial  2: relative flow change = 0.000822
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.193259
              PRV ~@RV-5 switched from open to active
              Trial  4: relative flow change = 0.044683
              Trial  5: relative flow change = 0.006215
              Trial  6: relative flow change = 0.000172
              Trial  7: relative flow change = 0.000004
                        maximum  flow change = 0.0332 for Link P-474
                        maximum  head error  = 0.0000 for Link P-474

    11:00:00: Balanced after 7 trials
    11:00:00: Pipe P-1 changed from temporarily closed to open
    11:00:00: PRV ~@RV-5 changed from open to active
   
    12:00:00: Balancing the network:

              Trial  1: relative flow change = 0.115203
              Trial  2: relative flow change = 0.009191
              Trial  3: relative flow change = 0.000236
              Trial  4: relative flow change = 0.000001
                        maximum  flow change = 0.0190 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    12:00:00: Balanced after 4 trials
    12:00:00: Tank T-8 is filling at 119.59 ft
    12:00:00: Tank T-9 is emptying at 139.01 ft
   
    12:15:41: Balancing the network:

              Trial  1: relative flow change = 0.066763
              Trial  2: relative flow change = 0.019496
              Trial  3: relative flow change = 0.021684
              Trial  4: relative flow change = 0.003309
              Trial  5: relative flow change = 0.000326
              Trial  6: relative flow change = 0.000004
                        maximum  flow change = 0.1887 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

    12:15:41: Balanced after 6 trials
    12:15:41: Tank T-8 is emptying at 122.45 ft
    12:15:41: Tank T-9 is filling at 133.60 ft
   
    13:00:00: Balancing the network:

              Trial  1: relative flow change = 0.084692
              Trial  2: relative flow change = 0.005229
              Trial  3: relative flow change = 0.000082
                        maximum  flow change = 0.3398 for Link P-242
                        maximum  head error  = 0.0000 for Link P-242

    13:00:00: Balanced after 3 trials
    13:00:00: Tank T-8 is filling at 120.27 ft
    13:00:00: Tank T-9 is emptying at 135.81 ft
   
    13:09:05: Balancing the network:

              Trial  1: relative flow change = 0.031386
              Trial  2: relative flow change = 0.006934
              Pipe P-1 switched from open to closed
              Pipe P-948 switched from open to closed
              Trial  3: relative flow change = 0.223346
              Trial  4: relative flow change = 0.026313
              Trial  5: relative flow change = 0.002850
              PRV ~@RV-5 switched from active to open
              Trial  6: relative flow change = 0.000566
              Trial  7: relative flow change = 0.000023
                        maximum  flow change = 0.0345 for Link P-469
                        maximum  head error  = 0.0000 for Link P-39

    13:09:05: Balanced after 7 trials
    13:09:05: Tank T-8 is closed at 121.39 ft
    13:09:05: Tank T-9 is closed at 133.59 ft
    13:09:05: Pipe P-1 changed from open to temporarily closed
    13:09:05: Pipe P-948 changed from open to temporarily closed
    13:09:05: PRV ~@RV-5 changed from active to open
   
    14:00:00: Balancing the network:

              Trial  1: relative flow change = 0.015185
              Trial  2: relative flow change = 0.000631
              Trial  3: relative flow change = 0.000016
                        maximum  flow change = 0.0768 for Link P-39
                        maximum  head error  = 0.0000 for Link P-39

    14:00:00: Balanced after 3 trials
   
    14:38:36: Balancing the network:

              Trial  1: relative flow change = 0.006364
              Trial  2: relative flow change = 0.000605
              Pipe P-5 switched from open to closed
              Trial  3: relative flow change = 0.079379
              Trial  4: relative flow change = 0.005505
              Trial  5: relative flow change = 0.000444
              Trial  6: relative flow change = 0.000096
                        maximum  flow change = 0.8340 for Link P-272
                        maximum  head error  = 0.0010 for Link P-272

    14:38:36: Balanced after 6 trials
    14:38:36: Tank T-12 is closed at 148.36 ft
    14:38:36: Pipe P-5 changed from open to temporarily closed
   
    15:00:00: Balancing the network:

              Trial  1: relative flow change = 0.004066
              Trial  2: relative flow change = 0.000381
              Trial  3: relative flow change = 0.000010
                        maximum  flow change = 0.0604 for Link P-814
                        maximum  head error  = 0.0000 for Link P-814

    15:00:00: Balanced after 3 trials
   
    16:00:00: Balancing the network:

              Trial  1: relative flow change = 0.013360
              Trial  2: relative flow change = 0.003018
              Trial  3: relative flow change = 0.000032
                        maximum  flow change = 0.0716 for Link P-785
                        maximum  head error  = 0.0000 for Link P-814

    16:00:00: Balanced after 3 trials
   
    17:00:00: Balancing the network:

              Trial  1: relative flow change = 0.037394
              Trial  2: relative flow change = 0.007188
              PRV ~@RV-4 switched from active to open
              Trial  3: relative flow change = 0.000691
              Trial  4: relative flow change = 0.000047
                        maximum  flow change = 0.3527 for Link P-814
                        maximum  head error  = 0.0007 for Link P-814

    17:00:00: Balanced after 4 trials
    17:00:00: Tank T-4 is emptying at 80.85 ft
    17:00:00: PRV ~@RV-4 changed from active to open
   
    18:00:00: Balancing the network:

              Trial  1: relative flow change = 0.068693
              Trial  2: relative flow change = 0.001887
              Trial  3: relative flow change = 0.000024
                        maximum  flow change = 0.2556 for Link P-867
                        maximum  head error  = 0.0000 for Link P-85

    18:00:00: Balanced after 3 trials
   
    18:08:30: Pump ~@Pump-13 changed by Tank T-1 control
    18:08:30: Balancing the network:

              Trial  1: relative flow change = 0.035853
              Trial  2: relative flow change = 0.073522
              Trial  3: relative flow change = 0.023662
              Trial  4: relative flow change = 0.017348
              Trial  5: relative flow change = 0.004268
              Trial  6: relative flow change = 0.000119
              Trial  7: relative flow change = 0.000000
                        maximum  flow change = 0.0011 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-13

    18:08:30: Balanced after 7 trials
    18:08:30: Tank T-1 is filling at 130.78 ft
    18:08:30: Pump ~@Pump-13 changed from closed to open
   
    19:00:00: Balancing the network:

              Trial  1: relative flow change = 0.072217
              Trial  2: relative flow change = 0.002197
              Trial  3: relative flow change = 0.000015
                        maximum  flow change = 0.0404 for Link P-747
                        maximum  head error  = 0.0000 for Link P-601

    19:00:00: Balanced after 3 trials
    19:00:00: Tank T-1 is emptying at 130.81 ft
   
    20:00:00: Balancing the network:

              Trial  1: relative flow change = 0.019907
              Trial  2: relative flow change = 0.000487
              Trial  3: relative flow change = 0.000001
                        maximum  flow change = 0.0137 for Link P-675
                        maximum  head error  = 0.0000 for Link P-1001

    20:00:00: Balanced after 3 trials
   
    20:52:41: Balancing the network:

              Trial  1: relative flow change = 0.010185
              Trial  2: relative flow change = 0.000366
              Pipe P-1030 switched from closed to open
              Pipe P-9 switched from open to closed
              Trial  3: relative flow change = 0.092524
              PRV ~@RV-1 switched from closed to open
              Trial  4: relative flow change = 0.012253
              Trial  5: relative flow change = 0.001944
              Trial  6: relative flow change = 0.000616
              Trial  7: relative flow change = 0.000133
              Trial  8: relative flow change = 0.000008
                        maximum  flow change = 0.0663 for Link P-692
                        maximum  head error  = 0.0001 for Link P-55

    20:52:41: Balanced after 8 trials
    20:52:41: Tank T-11 is emptying at 106.61 ft
    20:52:41: Tank T-13 is closed at 65.48 ft
    20:52:41: Pipe P-1030 changed from temporarily closed to open
    20:52:41: Pipe P-9 changed from open to temporarily closed
    20:52:41: PRV ~@RV-1 changed from closed to open
   
  WARNING: Negative pressures at 20:52:41 hrs.
   
    21:00:00: Balancing the network:

              Trial  1: relative flow change = 0.042261
              Trial  2: relative flow change = 0.000739
              Trial  3: relative flow change = 0.000007
                        maximum  flow change = 0.0756 for Link P-85
                        maximum  head error  = 0.0000 for Link P-85

    21:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 21:00:00 hrs.
   
    22:00:00: Balancing the network:

              Trial  1: relative flow change = 0.585400
              PRV ~@RV-1 switched from open to active
              PRV ~@RV-2 switched from open to active
              PRV ~@RV-4 switched from open to active
              PRV ~@RV-5 switched from open to active
              Trial  2: relative flow change = 0.094641
              PRV ~@RV-2 switched from active to open
              Trial  3: relative flow change = 0.064698
              PRV ~@RV-1 switched from active to closed
              PRV ~@RV-5 switched from active to open
              Trial  4: relative flow change = 0.071641
              Pipe P-9 switched from closed to open
              Trial  5: relative flow change = 0.038768
              Trial  6: relative flow change = 0.003677
              Trial  7: relative flow change = 0.000134
              Trial  8: relative flow change = 0.000001
                        maximum  flow change = 0.0017 for Link P-451
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    22:00:00: Balanced after 8 trials
    22:00:00: Tank T-1 is filling at 130.20 ft
    22:00:00: Tank T-11 is filling at 106.59 ft
    22:00:00: Tank T-13 is filling at 65.48 ft
    22:00:00: Tank T-4 is filling at 78.64 ft
    22:00:00: Pipe P-9 changed from temporarily closed to open
    22:00:00: PRV ~@RV-1 changed from open to closed
    22:00:00: PRV ~@RV-4 changed from open to active
   
    22:01:27: Balancing the network:

              Trial  1: relative flow change = 0.000100
              Trial  2: relative flow change = 0.000009
                        maximum  flow change = 0.0157 for Link P-783
                        maximum  head error  = 0.0000 for Link ~@Pump-11

              Pipe P-1030 switched from open to closed
              Trial  3: relative flow change = 0.007384
              Trial  4: relative flow change = 0.001195
              Trial  5: relative flow change = 0.000049
                        maximum  flow change = 0.2934 for Link P-389
                        maximum  head error  = 0.0002 for Link P-145

    22:01:27: Balanced after 5 trials
    22:01:27: Tank T-11 is closed at 106.61 ft
    22:01:27: Pipe P-1030 changed from open to temporarily closed
   
    22:09:40: Balancing the network:

              Trial  1: relative flow change = 0.000444
              Trial  2: relative flow change = 0.000053
                        maximum  flow change = 0.0891 for Link P-783
                        maximum  head error  = 0.0000 for Link ~@Pump-11

              Pipe P-630 switched from open to closed
              Pipe P-881 switched from open to closed
              Trial  3: relative flow change = 0.203129
              Trial  4: relative flow change = 0.018026
              PRV ~@RV-4 switched from active to open
              Trial  5: relative flow change = 0.003011
              Trial  6: relative flow change = 0.000189
              Trial  7: relative flow change = 0.000005
                        maximum  flow change = 0.0156 for Link P-624
                        maximum  head error  = 0.0000 for Link P-624

    22:09:40: Balanced after 7 trials
    22:09:40: Tank T-5 is closed at 124.36 ft
    22:09:40: Pipe P-630 changed from open to temporarily closed
    22:09:40: Pipe P-881 changed from open to temporarily closed
    22:09:40: PRV ~@RV-4 changed from active to open
   
    23:00:00: Balancing the network:

              Trial  1: relative flow change = 0.293262
              PRV ~@RV-2 switched from open to active
              PRV ~@RV-4 switched from open to active
              Trial  2: relative flow change = 0.035814
              Trial  3: relative flow change = 0.016049
              Trial  4: relative flow change = 0.001300
              Trial  5: relative flow change = 0.000073
                        maximum  flow change = 0.1869 for Link P-192
                        maximum  head error  = 0.0000 for Link P-192

    23:00:00: Balanced after 5 trials
    23:00:00: Tank T-10 is filling at 171.61 ft
    23:00:00: PRV ~@RV-2 changed from open to active
    23:00:00: PRV ~@RV-4 changed from open to active
   
    24:00:00: Balancing the network:

              Trial  1: relative flow change = 0.095329
              PRV ~@RV-5 switched from open to active
              Trial  2: relative flow change = 0.021101
              Trial  3: relative flow change = 0.005925
              Trial  4: relative flow change = 0.000309
              Trial  5: relative flow change = 0.000010
                        maximum  flow change = 0.0506 for Link P-633
                        maximum  head error  = 0.0000 for Link P-633

    24:00:00: Balanced after 5 trials
    24:00:00: Tank T-6 is filling at 102.64 ft
    24:00:00: PRV ~@RV-5 changed from open to active
   
    25:00:00: Balancing the network:

              Trial  1: relative flow change = 0.045964
              Trial  2: relative flow change = 0.009908
              Trial  3: relative flow change = 0.001286
              Trial  4: relative flow change = 0.000013
                        maximum  flow change = 0.0230 for Link P-976
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    25:00:00: Balanced after 4 trials
   
    26:00:00: Balancing the network:

              Trial  1: relative flow change = 0.022138
              Trial  2: relative flow change = 0.005755
              Pipe P-5 switched from closed to open
              Trial  3: relative flow change = 0.001141
              Trial  4: relative flow change = 0.000274
              Trial  5: relative flow change = 0.000011
                        maximum  flow change = 0.0153 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    26:00:00: Balanced after 5 trials
    26:00:00: Tank T-12 is filling at 148.36 ft
    26:00:00: Pipe P-5 changed from temporarily closed to open
   
    27:00:00: Balancing the network:

              Trial  1: relative flow change = 0.003514
              Trial  2: relative flow change = 0.001227
              Trial  3: relative flow change = 0.000030
                        maximum  flow change = 0.0415 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    27:00:00: Balanced after 3 trials
   
    27:16:49: Pump ~@Pump-9 changed by Tank T-4 control
    27:16:49: Balancing the network:

              Trial  1: relative flow change = 0.187124
              Trial  2: relative flow change = 0.005712
              Pipe P-630 switched from closed to open
              Pipe P-881 switched from closed to open
              Trial  3: relative flow change = 0.038525
              Trial  4: relative flow change = 0.003568
              Trial  5: relative flow change = 0.000236
              Trial  6: relative flow change = 0.000048
                        maximum  flow change = 2.5215 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link P-833

    27:16:49: Balanced after 6 trials
    27:16:49: Tank T-4 is emptying at 84.61 ft
    27:16:49: Tank T-5 is filling at 124.36 ft
    27:16:49: Pipe P-630 changed from temporarily closed to open
    27:16:49: Pipe P-881 changed from temporarily closed to open
    27:16:49: Pump ~@Pump-9 changed from open to closed
   
    28:00:00: Balancing the network:

              Trial  1: relative flow change = 0.028628
              Trial  2: relative flow change = 0.003724
              Trial  3: relative flow change = 0.000684
              Trial  4: relative flow change = 0.000007
                        maximum  flow change = 0.1576 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    28:00:00: Balanced after 4 trials
    28:00:00: Tank T-12 is emptying at 148.43 ft
   
    29:00:00: Balancing the network:

              Trial  1: relative flow change = 0.050929
              Trial  2: relative flow change = 0.008567
              Trial  3: relative flow change = 0.001373
              Trial  4: relative flow change = 0.000008
                        maximum  flow change = 0.0098 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    29:00:00: Balanced after 4 trials
   
    29:04:25: Balancing the network:

              Trial  1: relative flow change = 0.000709
              Trial  2: relative flow change = 0.000080
                        maximum  flow change = 0.0935 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-10

              Pipe P-5 switched from open to closed
              Trial  3: relative flow change = 0.011111
              Trial  4: relative flow change = 0.002866
              Trial  5: relative flow change = 0.000119
              Trial  6: relative flow change = 0.000002
                        maximum  flow change = 0.0027 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    29:04:25: Balanced after 6 trials
    29:04:25: Tank T-12 is closed at 148.36 ft
    29:04:25: Pipe P-5 changed from open to temporarily closed
   
    30:00:00: Balancing the network:

              Trial  1: relative flow change = 0.088700
              Trial  2: relative flow change = 0.021898
              Trial  3: relative flow change = 0.002545
              Trial  4: relative flow change = 0.000034
                        maximum  flow change = 0.0615 for Link P-808
                        maximum  head error  = 0.0000 for Link P-974

    30:00:00: Balanced after 4 trials
    30:00:00: Tank T-5 is emptying at 124.61 ft
   
    31:00:00: Balancing the network:

              Trial  1: relative flow change = 0.188667
              PRV ~@RV-2 switched from active to open
              PRV ~@RV-5 switched from active to open
              Trial  2: relative flow change = 0.056691
              Trial  3: relative flow change = 0.009434
              Trial  4: relative flow change = 0.000726
              Trial  5: relative flow change = 0.000079
                        maximum  flow change = 0.6467 for Link P-821
                        maximum  head error  = 0.0002 for Link P-821

    31:00:00: Balanced after 5 trials
    31:00:00: Tank T-10 is emptying at 174.40 ft
    31:00:00: Tank T-6 is emptying at 108.43 ft
    31:00:00: PRV ~@RV-2 changed from active to open
    31:00:00: PRV ~@RV-5 changed from active to open
   
    32:00:00: Balancing the network:

              Trial  1: relative flow change = 0.137078
              Trial  2: relative flow change = 0.024012
              PRV ~@RV-4 switched from active to open
              Trial  3: relative flow change = 0.011099
              Trial  4: relative flow change = 0.000139
              Trial  5: relative flow change = 0.000001
                        maximum  flow change = 0.0010 for Link P-310
                        maximum  head error  = 0.0000 for Link P-200

    32:00:00: Balanced after 5 trials
    32:00:00: Tank T-13 is emptying at 89.13 ft
    32:00:00: PRV ~@RV-4 changed from active to open
   
    32:05:38: Balancing the network:

              Trial  1: relative flow change = 0.001064
              Trial  2: relative flow change = 0.000003
                        maximum  flow change = 0.0111 for Link P-718
                        maximum  head error  = 0.0000 for Link P-601

              Pipe P-630 switched from open to closed
              Pipe P-881 switched from open to closed
              Trial  3: relative flow change = 0.106063
              Trial  4: relative flow change = 0.005137
              Trial  5: relative flow change = 0.000546
              Trial  6: relative flow change = 0.000049
                        maximum  flow change = 0.2307 for Link P-814
                        maximum  head error  = 0.0003 for Link P-814

    32:05:38: Balanced after 6 trials
    32:05:38: Tank T-5 is closed at 124.36 ft
    32:05:38: Pipe P-630 changed from open to temporarily closed
    32:05:38: Pipe P-881 changed from open to temporarily closed
   
    32:47:18: Pump ~@Pump-9 changed by Tank T-4 control
    32:47:18: Balancing the network:

              Trial  1: relative flow change = 0.090507
              Trial  2: relative flow change = 0.190371
              Trial  3: relative flow change = 0.014063
              Trial  4: relative flow change = 0.001564
              Trial  5: relative flow change = 0.000278
              Trial  6: relative flow change = 0.000017
                        maximum  flow change = 0.0973 for Link P-814
                        maximum  head error  = 0.0000 for Link P-814

    32:47:18: Balanced after 6 trials
    32:47:18: Pump ~@Pump-9 changed from closed to open
   
    33:00:00: Balancing the network:

              Trial  1: relative flow change = 0.048146
              Trial  2: relative flow change = 0.001207
              Trial  3: relative flow change = 0.000002
                        maximum  flow change = 0.0067 for Link P-59
                        maximum  head error  = 0.0000 for Link P-445

    33:00:00: Balanced after 3 trials
   
    34:00:00: Balancing the network:

              Trial  1: relative flow change = 0.015404
              Trial  2: relative flow change = 0.000354
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0004 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-9

    34:00:00: Balanced after 3 trials
   
    35:00:00: Balancing the network:

              Trial  1: relative flow change = 0.007130
              Trial  2: relative flow change = 0.000079
                        maximum  flow change = 0.1870 for Link P-650
                        maximum  head error  = 0.0000 for Link ~@Pump-3

    35:00:00: Balanced after 2 trials
   
    35:32:06: Balancing the network:

              Trial  1: relative flow change = 0.003781
              Trial  2: relative flow change = 0.000023
                        maximum  flow change = 0.0606 for Link P-650
                        maximum  head error  = 0.0000 for Link ~@Pump-3

              Pipe P-512 switched from open to closed
              Trial  3: relative flow change = 0.341853
              Trial  4: relative flow change = 0.069561
              Pipe P-596 switched from closed to open
              Trial  5: relative flow change = 0.172711
              Trial  6: relative flow change = 0.032764
              Trial  7: relative flow change = 0.002604
              Trial  8: relative flow change = 0.000055
                        maximum  flow change = 0.5190 for Link P-102
                        maximum  head error  = 0.0004 for Link P-728

    35:32:06: Balanced after 8 trials
    35:32:06: Tank T-1 is emptying at 140.58 ft
    35:32:06: Tank T-2 is emptying at 97.67 ft
    35:32:06: Tank T-6 is closed at 97.72 ft
    35:32:06: Pipe P-512 changed from open to temporarily closed
    35:32:06: Pipe P-596 changed from temporarily closed to open
   
  WARNING: Negative pressures at 35:32:06 hrs.
   
    36:00:00: Balancing the network:

              Trial  1: relative flow change = 0.011030
              Trial  2: relative flow change = 0.000140
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0009 for Link P-1015
                        maximum  head error  = 0.0000 for Link P-728

    36:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 36:00:00 hrs.
   
    37:00:00: Balancing the network:

              Trial  1: relative flow change = 0.027833
              Trial  2: relative flow change = 0.000514
              Trial  3: relative flow change = 0.000005
                        maximum  flow change = 0.0741 for Link P-728
                        maximum  head error  = 0.0000 for Link P-728

    37:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 37:00:00 hrs.
   
    38:00:00: Balancing the network:

              Trial  1: relative flow change = 0.013077
              Trial  2: relative flow change = 0.000197
              Trial  3: relative flow change = 0.000006
                        maximum  flow change = 0.0915 for Link P-728
                        maximum  head error  = 0.0000 for Link P-728

    38:00:00: Balanced after 3 trials
    38:00:00: Tank T-1 is closed at 140.47 ft
   
  WARNING: Negative pressures at 38:00:00 hrs.
   
    39:00:00: Balancing the network:

              Trial  1: relative flow change = 0.004354
              Trial  2: relative flow change = 0.000039
                        maximum  flow change = 0.1945 for Link P-728
                        maximum  head error  = 0.0001 for Link P-728

    39:00:00: Balanced after 2 trials
   
  WARNING: Negative pressures at 39:00:00 hrs.
   
    40:00:00: Balancing the network:

              Trial  1: relative flow change = 0.011415
              Trial  2: relative flow change = 0.000249
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0004 for Link P-310
                        maximum  head error  = 0.0000 for Link P-211

    40:00:00: Balanced after 3 trials
    40:00:00: Tank T-1 is emptying at 140.47 ft
   
  WARNING: Negative pressures at 40:00:00 hrs.
   
    41:00:00: Balancing the network:

              Trial  1: relative flow change = 0.039683
              Trial  2: relative flow change = 0.001082
              Pipe P-1030 switched from closed to open
              Trial  3: relative flow change = 0.000019
                        maximum  flow change = 0.2860 for Link P-728
                        maximum  head error  = 0.0002 for Link P-728

    41:00:00: Balanced after 3 trials
    41:00:00: Pipe P-1030 changed from temporarily closed to open
   
  WARNING: Negative pressures at 41:00:00 hrs.
   
    41:14:39: Balancing the network:

              Trial  1: relative flow change = 0.001191
              Trial  2: relative flow change = 0.000006
                        maximum  flow change = 0.0647 for Link P-728
                        maximum  head error  = 0.0000 for Link P-211

              Pipe P-3 switched from open to closed
              Trial  3: relative flow change = 0.042807
              PRV ~@RV-3 switched from active to open
              Trial  4: relative flow change = 0.000318
              Trial  5: relative flow change = 0.000039
                        maximum  flow change = 0.6385 for Link P-728
                        maximum  head error  = 0.0007 for Link P-728

    41:14:39: Balanced after 5 trials
    41:14:39: Tank T-11 is emptying at 106.61 ft
    41:14:39: Tank T-4 is closed at 74.61 ft
    41:14:39: Pipe P-3 changed from open to temporarily closed
    41:14:39: PRV ~@RV-3 changed from active to open
   
  WARNING: Negative pressures at 41:14:39 hrs.
   
    42:00:00: Balancing the network:

              Trial  1: relative flow change = 0.072882
              Trial  2: relative flow change = 0.001300
              Trial  3: relative flow change = 0.000007
                        maximum  flow change = 0.0806 for Link P-102
                        maximum  head error  = 0.0000 for Link P-728

    42:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 42:00:00 hrs.
   
    43:00:00: Balancing the network:

              Trial  1: relative flow change = 0.080813
              Trial  2: relative flow change = 0.001845
              Trial  3: relative flow change = 0.000008
                        maximum  flow change = 0.0355 for Link P-1015
                        maximum  head error  = 0.0000 for Link ~@Pump-2

    43:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 43:00:00 hrs.
   
    44:00:00: Balancing the network:

              Trial  1: relative flow change = 0.019040
              Trial  2: relative flow change = 0.000203
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0006 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-2

    44:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 44:00:00 hrs.
   
    44:02:39: Balancing the network:

              Trial  1: relative flow change = 0.000242
              Trial  2: relative flow change = 0.000000
                        maximum  flow change = 0.0012 for Link P-1015
                        maximum  head error  = 0.0000 for Link P-783

              Pipe P-596 switched from open to closed
              Trial  3: relative flow change = 0.164426
              Trial  4: relative flow change = 0.014336
              Trial  5: relative flow change = 0.000785
              Trial  6: relative flow change = 0.000039
                        maximum  flow change = 0.4455 for Link P-102
                        maximum  head error  = 0.0001 for Link P-102

    44:02:39: Balanced after 6 trials
    44:02:39: Tank T-2 is closed at 72.67 ft
    44:02:39: Pipe P-596 changed from open to temporarily closed
   
  WARNING: Negative pressures at 44:02:39 hrs.
   
    45:00:00: Balancing the network:

              Trial  1: relative flow change = 0.033425
              Trial  2: relative flow change = 0.000152
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0005 for Link P-108
                        maximum  head error  = 0.0000 for Link ~@Pump-13

    45:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 45:00:00 hrs.
   
    46:00:00: Balancing the network:

              Trial  1: relative flow change = 0.447023
              PRV ~@RV-3 switched from open to active
              Trial  2: relative flow change = 0.029133
              Pipe P-3 switched from closed to open
              Trial  3: relative flow change = 0.003428
              Trial  4: relative flow change = 0.000056
                        maximum  flow change = 0.0837 for Link P-3
                        maximum  head error  = 0.0001 for Link ~@Pump-9

    46:00:00: Balanced after 4 trials
    46:00:00: Tank T-1 is filling at 138.14 ft
    46:00:00: Tank T-11 is filling at 104.64 ft
    46:00:00: Tank T-13 is filling at 69.87 ft
    46:00:00: Tank T-4 is filling at 74.61 ft
    46:00:00: Pipe P-3 changed from temporarily closed to open
    46:00:00: PRV ~@RV-3 changed from open to active
   
  WARNING: Negative pressures at 46:00:00 hrs.
   
    47:00:00: Balancing the network:

              Trial  1: relative flow change = 0.204045
              PRV ~@RV-2 switched from open to active
              PRV ~@RV-4 switched from open to active
              Trial  2: relative flow change = 0.030162
              Pipe P-512 switched from closed to open
              Pipe P-596 switched from closed to open
              Trial  3: relative flow change = 0.455978
              PRV ~@RV-4 switched from active to open
              Trial  4: relative flow change = 0.241783
              PRV ~@RV-4 switched from open to active
              Pipe P-512 switched from open to closed
              Trial  5: relative flow change = 0.324134
              PRV ~@RV-4 switched from active to open
              Trial  6: relative flow change = 0.063632
              PRV ~@RV-2 switched from active to open
              Trial  7: relative flow change = 0.011911
              Trial  8: relative flow change = 0.002594
              Trial  9: relative flow change = 0.000403
              Trial 10: relative flow change = 0.000049
                        maximum  flow change = 0.2625 for Link P-297
                        maximum  head error  = 0.0000 for Link P-297

    47:00:00: Balanced after 10 trials
    47:00:00: Tank T-2 is filling at 72.67 ft
    47:00:00: Pipe P-596 changed from temporarily closed to open
   
    48:00:00: Balancing the network:

              Trial  1: relative flow change = 0.090625
              PRV ~@RV-2 switched from open to active
              Trial  2: relative flow change = 0.004114
              Trial  3: relative flow change = 0.000039
                        maximum  flow change = 0.1208 for Link P-374
                        maximum  head error  = 0.0000 for Link P-145

    48:00:00: Balanced after 3 trials
    48:00:00: PRV ~@RV-2 changed from open to active
   
    49:00:00: Balancing the network:

              Trial  1: relative flow change = 0.047606
              PRV ~@RV-4 switched from open to active
              Trial  2: relative flow change = 0.007145
              Trial  3: relative flow change = 0.003200
              Trial  4: relative flow change = 0.000100
                        maximum  flow change = 0.2526 for Link P-89
                        maximum  head error  = 0.0001 for Link ~@Pump-11

    49:00:00: Balanced after 4 trials
    49:00:00: Tank T-10 is filling at 164.72 ft
    49:00:00: PRV ~@RV-4 changed from open to active
   
    49:24:54: Balancing the network:

              Trial  1: relative flow change = 0.001990
              Trial  2: relative flow change = 0.000216
              Pipe P-1030 switched from open to closed
              Trial  3: relative flow change = 0.005685
              Trial  4: relative flow change = 0.001000
              Trial  5: relative flow change = 0.000048
                        maximum  flow change = 0.1438 for Link P-444
                        maximum  head error  = 0.0001 for Link P-645

    49:24:54: Balanced after 5 trials
    49:24:54: Tank T-11 is closed at 106.61 ft
    49:24:54: Pipe P-1030 changed from open to temporarily closed
   
    50:00:00: Balancing the network:

              Trial  1: relative flow change = 0.020910
              Trial  2: relative flow change = 0.002760
              Trial  3: relative flow change = 0.000368
              Trial  4: relative flow change = 0.000010
                        maximum  flow change = 0.0246 for Link P-89
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    50:00:00: Balanced after 4 trials
   
   
  Hydraulic Status:
  -----------------------------------------------------------------------
     0:00:00: Pump ~@Pump-9 changed by Tank T-4 control
     0:00:00: Balancing the network:

              Trial  1: relative flow change = 53.169223
              PRV ~@RV-4 switched from active to closed
              Trial  2: relative flow change = 0.658903
              PRV ~@RV-1 switched from active to closed
              PRV ~@RV-4 switched from closed to active
              PRV ~@RV-5 switched from active to open
              Trial  3: relative flow change = 0.266258
              PRV ~@RV-5 switched from open to active
              Trial  4: relative flow change = 0.105494
              PRV ~@RV-4 switched from active to open
              Trial  5: relative flow change = 0.041299
              PRV ~@RV-4 switched from open to active
              Trial  6: relative flow change = 0.015220
              Trial  7: relative flow change = 0.024556
              Trial  8: relative flow change = 0.001297
              Trial  9: relative flow change = 0.000191
              Trial 10: relative flow change = 0.000005
                        maximum  flow change = 0.4383 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link P-452

     0:00:00: Balanced after 10 trials
     0:00:00: Reservoir R-1 is filling
     0:00:00: Reservoir R-2 is emptying
     0:00:00: Tank T-1 is filling at 140.78 ft
     0:00:00: Tank T-10 is emptying at 179.16 ft
     0:00:00: Tank T-11 is filling at 101.61 ft
     0:00:00: Tank T-12 is filling at 158.36 ft
     0:00:00: Tank T-13 is filling at 70.48 ft
     0:00:00: Tank T-2 is filling at 82.67 ft
     0:00:00: Tank T-3 is emptying at 67.79 ft
     0:00:00: Tank T-4 is emptying at 84.61 ft
     0:00:00: Tank T-5 is filling at 134.36 ft
     0:00:00: Tank T-6 is filling at 102.72 ft
     0:00:00: Tank T-7 is emptying at 142.29 ft
     0:00:00: Tank T-8 is filling at 121.77 ft
     0:00:00: Tank T-9 is emptying at 148.59 ft
     0:00:00: Pump ~@Pump-9 closed
     0:00:00: PRV ~@RV-1 closed
   
     0:32:22: Balancing the network:

              Trial  1: relative flow change = 0.107109
              Trial  2: relative flow change = 0.058159
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.043777
              Trial  4: relative flow change = 0.006881
              Trial  5: relative flow change = 0.000434
              Trial  6: relative flow change = 0.000004
                        maximum  flow change = 0.2821 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     0:32:22: Balanced after 6 trials
     0:32:22: Tank T-12 is closed at 158.49 ft
     0:32:22: Tank T-8 is emptying at 130.27 ft
     0:32:22: Tank T-9 is filling at 133.59 ft
     0:32:22: Pipe P-1 changed from open to temporarily closed
   
     1:00:00: Balancing the network:

              Trial  1: relative flow change = 0.095749
              Trial  2: relative flow change = 0.079867
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.079281
              Trial  4: relative flow change = 0.021572
              Trial  5: relative flow change = 0.003634
              Trial  6: relative flow change = 0.000222
              Trial  7: relative flow change = 0.000001
                        maximum  flow change = 0.1049 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     1:00:00: Balanced after 7 trials
     1:00:00: Tank T-12 is filling at 158.49 ft
     1:00:00: Tank T-8 is filling at 124.93 ft
     1:00:00: Tank T-9 is emptying at 142.62 ft
     1:00:00: Pipe P-1 changed from temporarily closed to open
   
     1:31:36: Balancing the network:

              Trial  1: relative flow change = 0.110954
              Trial  2: relative flow change = 0.051175
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.055616
              Trial  4: relative flow change = 0.007874
              Trial  5: relative flow change = 0.000541
              Trial  6: relative flow change = 0.000006
                        maximum  flow change = 0.2159 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     1:31:36: Balanced after 6 trials
     1:31:36: Tank T-8 is emptying at 129.93 ft
     1:31:36: Tank T-9 is filling at 133.59 ft
     1:31:36: Pipe P-1 changed from open to temporarily closed
   
     2:00:00: Balancing the network:

              Trial  1: relative flow change = 0.105524
              Trial  2: relative flow change = 0.158963
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.140122
              Trial  4: relative flow change = 0.054236
              Trial  5: relative flow change = 0.015602
              Trial  6: relative flow change = 0.003122
              Trial  7: relative flow change = 0.000152
              Trial  8: relative flow change = 0.000001
                        maximum  flow change = 0.0358 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     2:00:00: Balanced after 8 trials
     2:00:00: Tank T-8 is filling at 124.56 ft
     2:00:00: Tank T-9 is emptying at 142.67 ft
     2:00:00: Pipe P-1 changed from temporarily closed to open
   
     2:13:17: Balancing the network:

              Trial  1: relative flow change = 0.050854
              Trial  2: relative flow change = 0.008092
              Pipe P-1030 switched from open to closed
              Trial  3: relative flow change = 0.014211
              Trial  4: relative flow change = 0.002889
              Trial  5: relative flow change = 0.000340
              Trial  6: relative flow change = 0.000008
                        maximum  flow change = 0.0315 for Link P-1031
                        maximum  head error  = 0.0000 for Link P-645

     2:13:17: Balanced after 6 trials
     2:13:17: Tank T-10 is filling at 177.68 ft
     2:13:17: Tank T-11 is closed at 106.61 ft
     2:13:17: Pipe P-1030 changed from open to temporarily closed
   
     2:19:58: Pump ~@Pump-13 changed by Tank T-1 control
     2:19:58: Balancing the network:

              Trial  1: relative flow change = 0.070744
              Trial  2: relative flow change = 0.015803
              Trial  3: relative flow change = 0.004456
              Trial  4: relative flow change = 0.000600
              Trial  5: relative flow change = 0.000052
                        maximum  flow change = 4.0825 for Link ~@Pump-13
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     2:19:58: Balanced after 5 trials
     2:19:58: Tank T-1 is emptying at 143.78 ft
     2:19:58: Tank T-8 is emptying at 126.88 ft
     2:19:58: Tank T-9 is filling at 138.34 ft
     2:19:58: Pump ~@Pump-13 changed from open to closed
   
     2:42:06: Balancing the network:

              Trial  1: relative flow change = 0.078000
              Trial  2: relative flow change = 0.006620
              Pipe P-10 switched from open to closed
              Trial  3: relative flow change = 0.007022
              PRV ~@RV-2 switched from active to open
              Trial  4: relative flow change = 0.026226
              PRV ~@RV-2 switched from open to active
              Trial  5: relative flow change = 0.000706
              Trial  6: relative flow change = 0.000007
                        maximum  flow change = 0.0755 for Link P-867
                        maximum  head error  = 0.0000 for Link P-85

     2:42:06: Balanced after 6 trials
     2:42:06: Tank T-3 is closed at 61.79 ft
     2:42:06: Tank T-8 is filling at 126.10 ft
     2:42:06: Tank T-9 is emptying at 139.27 ft
     2:42:06: Pipe P-10 changed from open to temporarily closed
   
     3:00:00: Balancing the network:

              Trial  1: relative flow change = 0.071021
              Trial  2: relative flow change = 0.021941
              Trial  3: relative flow change = 0.006916
              Trial  4: relative flow change = 0.000974
              Trial  5: relative flow change = 0.000021
                        maximum  flow change = 1.6877 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     3:00:00: Balanced after 5 trials
     3:00:00: Tank T-8 is emptying at 127.38 ft
     3:00:00: Tank T-9 is filling at 136.76 ft
   
     3:29:28: Balancing the network:

              Trial  1: relative flow change = 0.128885
              Trial  2: relative flow change = 0.034137
              Pipe P-596 switched from open to closed
              Trial  3: relative flow change = 0.382797
              Trial  4: relative flow change = 0.062182
              Trial  5: relative flow change = 0.005682
              Trial  6: relative flow change = 0.000371
              Trial  7: relative flow change = 0.000006
                        maximum  flow change = 0.0175 for Link P-370
                        maximum  head error  = 0.0000 for Link P-370

     3:29:28: Balanced after 7 trials
     3:29:28: Tank T-2 is closed at 97.67 ft
     3:29:28: Tank T-8 is filling at 124.47 ft
     3:29:28: Tank T-9 is emptying at 141.14 ft
     3:29:28: Pipe P-596 changed from open to temporarily closed
   
     3:58:05: Balancing the network:

              Trial  1: relative flow change = 0.142588
              Trial  2: relative flow change = 0.081793
              Trial  3: relative flow change = 0.032269
              Trial  4: relative flow change = 0.007733
              Trial  5: relative flow change = 0.000543
              Trial  6: relative flow change = 0.000003
                        maximum  flow change = 0.1694 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     3:58:05: Balanced after 6 trials
     3:58:05: Tank T-8 is emptying at 128.56 ft
     3:58:05: Tank T-9 is filling at 133.60 ft
   
     3:58:15: Balancing the network:

              Trial  1: relative flow change = 0.000846
              Trial  2: relative flow change = 0.000006
                        maximum  flow change = 0.0404 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-10

              Pipe P-678 switched from open to closed
              Trial  3: relative flow change = 0.257541
              Trial  4: relative flow change = 0.040429
              Trial  5: relative flow change = 0.004938
              Trial  6: relative flow change = 0.000229
              Trial  7: relative flow change = 0.000003
                        maximum  flow change = 0.0107 for Link P-593
                        maximum  head error  = 0.0000 for Link P-593

     3:58:15: Balanced after 7 trials
     3:58:15: Tank T-7 is closed at 117.29 ft
     3:58:15: Pipe P-678 changed from open to temporarily closed
   
     4:00:00: Balancing the network:

              Trial  1: relative flow change = 0.020472
              Trial  2: relative flow change = 0.004624
              Trial  3: relative flow change = 0.000722
              Trial  4: relative flow change = 0.000005
                        maximum  flow change = 0.0070 for Link P-783
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     4:00:00: Balanced after 4 trials
   
     5:00:00: Balancing the network:

              Trial  1: relative flow change = 0.196163
              Trial  2: relative flow change = 0.049854
              Trial  3: relative flow change = 0.008360
              Trial  4: relative flow change = 0.000345
              Trial  5: relative flow change = 0.000020
                        maximum  flow change = 0.2061 for Link P-562
                        maximum  head error  = 0.0000 for Link P-562

     5:00:00: Balanced after 5 trials
     5:00:00: Tank T-8 is filling at 118.67 ft
     5:00:00: Tank T-9 is emptying at 149.01 ft
   
     5:28:57: Balancing the network:

              Trial  1: relative flow change = 0.181770
              Trial  2: relative flow change = 0.084623
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.172822
              Trial  4: relative flow change = 0.024552
              Trial  5: relative flow change = 0.001872
              Trial  6: relative flow change = 0.000039
                        maximum  flow change = 0.0435 for Link P-394
                        maximum  head error  = 0.0000 for Link ~@Pump-11

     5:28:57: Balanced after 6 trials
     5:28:57: Tank T-12 is emptying at 159.67 ft
     5:28:57: Tank T-8 is emptying at 127.19 ft
     5:28:57: Tank T-9 is filling at 133.59 ft
     5:28:57: Pipe P-1 changed from open to temporarily closed
   
     6:00:00: Balancing the network:

              Trial  1: relative flow change = 0.139388
              Trial  2: relative flow change = 0.108791
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.230828
              Trial  4: relative flow change = 0.064381
              Trial  5: relative flow change = 0.007726
              Trial  6: relative flow change = 0.000396
              Trial  7: relative flow change = 0.000018
                        maximum  flow change = 0.1084 for Link P-347
                        maximum  head error  = 0.0000 for Link P-347

     6:00:00: Balanced after 7 trials
     6:00:00: Tank T-8 is filling at 122.48 ft
     6:00:00: Tank T-9 is emptying at 141.55 ft
     6:00:00: Pipe P-1 changed from temporarily closed to open
   
     6:24:10: Balancing the network:

              Trial  1: relative flow change = 0.120292
              Trial  2: relative flow change = 0.155951
              Trial  3: relative flow change = 0.076070
              Trial  4: relative flow change = 0.029620
              Trial  5: relative flow change = 0.006893
              Trial  6: relative flow change = 0.000439
              Trial  7: relative flow change = 0.000002
                        maximum  flow change = 0.0925 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

     6:24:10: Balanced after 7 trials
     6:24:10: Tank T-8 is emptying at 126.77 ft
     6:24:10: Tank T-9 is filling at 133.60 ft
   
     6:54:59: Pump ~@Pump-8 changed by Tank T-13 control
     6:54:59: Balancing the network:

              Trial  1: relative flow change = 0.156679
              Trial  2: relative flow change = 0.249331
              CV P-75 switched from open to closed
              Trial  3: relative flow change = 0.085236
              PRV ~@RV-5 switched from active to closed
              Trial  4: relative flow change = 0.021403
              Trial  5: relative flow change = 0.002166
              Trial  6: relative flow change = 0.000033
                        maximum  flow change = 0.9298 for Link P-948
                        maximum  head error  = 45.3364 for Link ~@Pump-10

     6:54:59: Balanced after 6 trials
     6:54:59: Tank T-12 is filling at 159.34 ft
     6:54:59: Tank T-13 is emptying at 90.48 ft
     6:54:59: Tank T-8 is filling at 122.30 ft
     6:54:59: Tank T-9 is emptying at 140.48 ft
     6:54:59: CV P-75 changed from open to closed
     6:54:59: Pump ~@Pump-8 changed from open to closed
     6:54:59: PRV ~@RV-5 changed from active to closed
   
     7:00:00: Balancing the network:

              Trial  1: relative flow change = 0.186786
              Trial  2: relative flow change = 0.050736
              Trial  3: relative flow change = 0.007346
              Trial  4: relative flow change = 0.000138
              Trial  5: relative flow change = 0.000001
                        maximum  flow change = 0.0010 for Link P-89
                        maximum  head error  = 40.3756 for Link ~@Pump-10

     7:00:00: Balanced after 5 trials
     7:00:00: Tank T-12 is emptying at 159.35 ft
   
     7:21:55: Balancing the network:

              Trial  1: relative flow change = 0.097885
              Trial  2: relative flow change = 0.154766
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.254418
              Trial  4: relative flow change = 0.061973
              Trial  5: relative flow change = 0.011228
              Trial  6: relative flow change = 0.000741
              Trial  7: relative flow change = 0.000007
                        maximum  flow change = 0.1902 for Link P-948
                        maximum  head error  = 37.1376 for Link ~@Pump-10

     7:21:55: Balanced after 7 trials
     7:21:55: Tank T-10 is closed at 179.73 ft
     7:21:55: Tank T-6 is emptying at 130.22 ft
     7:21:55: Tank T-8 is emptying at 125.95 ft
     7:21:55: Tank T-9 is filling at 133.59 ft
     7:21:55: Pipe P-1 changed from open to temporarily closed
   
     8:00:00: Balancing the network:

              Trial  1: relative flow change = 0.215271
              PRV ~@RV-2 switched from active to open
              Trial  2: relative flow change = 0.078372
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.248714
              Trial  4: relative flow change = 0.067828
              Trial  5: relative flow change = 0.010294
              Trial  6: relative flow change = 0.001188
              Trial  7: relative flow change = 0.000055
                        maximum  flow change = 0.1249 for Link P-70
                        maximum  head error  = 36.6901 for Link ~@Pump-10

     8:00:00: Balanced after 7 trials
     8:00:00: Tank T-10 is emptying at 179.73 ft
     8:00:00: Tank T-5 is emptying at 136.69 ft
     8:00:00: Tank T-6 is filling at 130.18 ft
     8:00:00: Tank T-8 is filling at 120.93 ft
     8:00:00: Tank T-9 is emptying at 142.07 ft
     8:00:00: Pipe P-1 changed from temporarily closed to open
     8:00:00: PRV ~@RV-2 changed from active to open
   
     8:04:56: Pump ~@Pump-9 changed by Tank T-4 control
     8:04:56: Balancing the network:

              Trial  1: relative flow change = 0.045845
              Trial  2: relative flow change = 0.091534
              Trial  3: relative flow change = 0.038124
              Trial  4: relative flow change = 0.004975
              Trial  5: relative flow change = 0.000026
                        maximum  flow change = 0.0313 for Link P-667
                        maximum  head error  = 36.7578 for Link ~@Pump-10

     8:04:56: Balanced after 5 trials
     8:04:56: Tank T-4 is filling at 79.61 ft
     8:04:56: Pump ~@Pump-9 changed from closed to open
   
     8:26:05: Balancing the network:

              Trial  1: relative flow change = 0.105155
              Trial  2: relative flow change = 0.090164
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.211771
              Trial  4: relative flow change = 0.040362
              Trial  5: relative flow change = 0.004959
              Trial  6: relative flow change = 0.000225
              Trial  7: relative flow change = 0.000005
                        maximum  flow change = 0.0175 for Link P-45
                        maximum  head error  = 33.0453 for Link ~@Pump-10

     8:26:05: Balanced after 7 trials
     8:26:05: Tank T-6 is emptying at 130.29 ft
     8:26:05: Tank T-8 is emptying at 125.46 ft
     8:26:05: Tank T-9 is filling at 133.59 ft
     8:26:05: Pipe P-1 changed from open to temporarily closed
   
     9:00:00: Balancing the network:

              Trial  1: relative flow change = 0.101024
              Trial  2: relative flow change = 0.049181
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.235377
              Trial  4: relative flow change = 0.063751
              Trial  5: relative flow change = 0.011074
              Trial  6: relative flow change = 0.000974
              Trial  7: relative flow change = 0.000055
                        maximum  flow change = 0.2822 for Link P-722
                        maximum  head error  = 35.1937 for Link ~@Pump-10

     9:00:00: Balanced after 7 trials
     9:00:00: Tank T-6 is filling at 129.80 ft
     9:00:00: Tank T-8 is filling at 121.28 ft
     9:00:00: Tank T-9 is emptying at 140.65 ft
     9:00:00: Pipe P-1 changed from temporarily closed to open
   
     9:20:47: Balancing the network:

              Trial  1: relative flow change = 0.108431
              Trial  2: relative flow change = 0.064579
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.199302
              Trial  4: relative flow change = 0.029883
              Trial  5: relative flow change = 0.002941
              Trial  6: relative flow change = 0.000094
                        maximum  flow change = 0.1567 for Link P-36
                        maximum  head error  = 31.4814 for Link ~@Pump-10

     9:20:47: Balanced after 6 trials
     9:20:47: Tank T-6 is emptying at 129.81 ft
     9:20:47: Tank T-8 is emptying at 125.05 ft
     9:20:47: Tank T-9 is filling at 133.59 ft
     9:20:47: Pipe P-1 changed from open to temporarily closed
   
    10:00:00: Balancing the network:

              Trial  1: relative flow change = 0.080250
              Trial  2: relative flow change = 0.031407
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.234146
              Trial  4: relative flow change = 0.065756
              Trial  5: relative flow change = 0.012774
              Trial  6: relative flow change = 0.001200
              Trial  7: relative flow change = 0.000073
                        maximum  flow change = 0.1407 for Link P-974
                        maximum  head error  = 34.6231 for Link ~@Pump-10

    10:00:00: Balanced after 7 trials
    10:00:00: Tank T-8 is filling at 120.52 ft
    10:00:00: Tank T-9 is emptying at 141.25 ft
    10:00:00: Pipe P-1 changed from temporarily closed to open
   
    10:20:41: Balancing the network:

              Trial  1: relative flow change = 0.114756
              Trial  2: relative flow change = 0.053260
              Trial  3: relative flow change = 0.014295
              Trial  4: relative flow change = 0.002182
              Trial  5: relative flow change = 0.000057
                        maximum  flow change = 2.7825 for Link P-948
                        maximum  head error  = 34.0090 for Link ~@Pump-10

    10:20:41: Balanced after 5 trials
    10:20:41: Tank T-8 is emptying at 124.62 ft
    10:20:41: Tank T-9 is filling at 133.60 ft
   
    10:40:29: Pump ~@Pump-8 changed by Tank T-13 control
    10:40:29: Balancing the network:

              Trial  1: relative flow change = 0.135431
              PRV ~@RV-5 switched from closed to open
              Trial  2: relative flow change = 0.284342
              CV P-75 switched from closed to open
              Trial  3: relative flow change = 0.172684
              Trial  4: relative flow change = 0.083987
              Trial  5: relative flow change = 0.036923
              Trial  6: relative flow change = 0.012545
              Trial  7: relative flow change = 0.002053
              Trial  8: relative flow change = 0.000115
              Trial  9: relative flow change = 0.000115
              Trial 10: relative flow change = 0.000230
              Trial 11: relative flow change = 0.000459
              Trial 12: relative flow change = 0.000922
              Trial 13: relative flow change = 0.001854
              Trial 14: relative flow change = 0.003748
              Trial 15: relative flow change = 0.007636
              Trial 16: relative flow change = 0.015704
              Trial 17: relative flow change = 0.031957
              Trial 18: relative flow change = 0.056957
              Trial 19: relative flow change = 0.059098
              Trial 20: relative flow change = 0.017811
              PRV ~@RV-5 switched from open to active
              Trial 21: relative flow change = 0.001877
              Trial 22: relative flow change = 0.003028
              Trial 23: relative flow change = 0.000123
              Trial 24: relative flow change = 0.000000
                        maximum  flow change = 0.0005 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-10

    10:40:29: Balanced after 24 trials
    10:40:29: Tank T-8 is filling at 122.50 ft
    10:40:29: Tank T-9 is emptying at 136.63 ft
    10:40:29: CV P-75 changed from closed to open
    10:40:29: Pump ~@Pump-8 changed from closed to open
    10:40:29: PRV ~@RV-5 changed from closed to active
   
    10:55:56: Balancing the network:

              Trial  1: relative flow change = 0.046347
              Trial  2: relative flow change = 0.136604
              Pipe P-1 switched from open to closed
              Trial  3: relative flow change = 0.258060
              Trial  4: relative flow change = 0.050515
              PRV ~@RV-5 switched from active to open
              Trial  5: relative flow change = 0.012836
              Trial  6: relative flow change = 0.002111
              Trial  7: relative flow change = 0.000118
              Trial  8: relative flow change = 0.000004
                        maximum  flow change = 0.0553 for Link P-622
                        maximum  head error  = 0.0000 for Link P-622

    10:55:56: Balanced after 8 trials
    10:55:56: Tank T-8 is emptying at 123.98 ft
    10:55:56: Tank T-9 is filling at 133.59 ft
    10:55:56: Pipe P-1 changed from open to temporarily closed
    10:55:56: PRV ~@RV-5 changed from active to open
   
    11:00:00: Balancing the network:

              Trial  1: relative flow change = 0.006215
              Trial  2: relative flow change = 0.000822
              Pipe P-1 switched from closed to open
              Trial  3: relative flow change = 0.193259
              PRV ~@RV-5 switched from open to active
              Trial  4: relative flow change = 0.044683
              Trial  5: relative flow change = 0.006215
              Trial  6: relative flow change = 0.000172
              Trial  7: relative flow change = 0.000004
                        maximum  flow change = 0.0332 for Link P-474
                        maximum  head error  = 0.0000 for Link P-474

    11:00:00: Balanced after 7 trials
    11:00:00: Pipe P-1 changed from temporarily closed to open
    11:00:00: PRV ~@RV-5 changed from open to active
   
    12:00:00: Balancing the network:

              Trial  1: relative flow change = 0.115203
              Trial  2: relative flow change = 0.009191
              Trial  3: relative flow change = 0.000236
              Trial  4: relative flow change = 0.000001
                        maximum  flow change = 0.0190 for Link P-948
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    12:00:00: Balanced after 4 trials
    12:00:00: Tank T-8 is filling at 119.59 ft
    12:00:00: Tank T-9 is emptying at 139.01 ft
   
    12:15:41: Balancing the network:

              Trial  1: relative flow change = 0.066763
              Trial  2: relative flow change = 0.019496
              Trial  3: relative flow change = 0.021684
              Trial  4: relative flow change = 0.003309
              Trial  5: relative flow change = 0.000326
              Trial  6: relative flow change = 0.000004
                        maximum  flow change = 0.1887 for Link P-948
                        maximum  head error  = 0.0000 for Link P-948

    12:15:41: Balanced after 6 trials
    12:15:41: Tank T-8 is emptying at 122.45 ft
    12:15:41: Tank T-9 is filling at 133.60 ft
   
    13:00:00: Balancing the network:

              Trial  1: relative flow change = 0.084692
              Trial  2: relative flow change = 0.005229
              Trial  3: relative flow change = 0.000082
                        maximum  flow change = 0.3398 for Link P-242
                        maximum  head error  = 0.0000 for Link P-242

    13:00:00: Balanced after 3 trials
    13:00:00: Tank T-8 is filling at 120.27 ft
    13:00:00: Tank T-9 is emptying at 135.81 ft
   
    13:09:05: Balancing the network:

              Trial  1: relative flow change = 0.031386
              Trial  2: relative flow change = 0.006934
              Pipe P-1 switched from open to closed
              Pipe P-948 switched from open to closed
              Trial  3: relative flow change = 0.223346
              Trial  4: relative flow change = 0.026313
              Trial  5: relative flow change = 0.002850
              PRV ~@RV-5 switched from active to open
              Trial  6: relative flow change = 0.000566
              Trial  7: relative flow change = 0.000023
                        maximum  flow change = 0.0345 for Link P-469
                        maximum  head error  = 0.0000 for Link P-39

    13:09:05: Balanced after 7 trials
    13:09:05: Tank T-8 is closed at 121.39 ft
    13:09:05: Tank T-9 is closed at 133.59 ft
    13:09:05: Pipe P-1 changed from open to temporarily closed
    13:09:05: Pipe P-948 changed from open to temporarily closed
    13:09:05: PRV ~@RV-5 changed from active to open
   
    14:00:00: Balancing the network:

              Trial  1: relative flow change = 0.015185
              Trial  2: relative flow change = 0.000631
              Trial  3: relative flow change = 0.000016
                        maximum  flow change = 0.0768 for Link P-39
                        maximum  head error  = 0.0000 for Link P-39

    14:00:00: Balanced after 3 trials
   
    14:38:36: Balancing the network:

              Trial  1: relative flow change = 0.006364
              Trial  2: relative flow change = 0.000605
              Pipe P-5 switched from open to closed
              Trial  3: relative flow change = 0.079379
              Trial  4: relative flow change = 0.005505
              Trial  5: relative flow change = 0.000444
              Trial  6: relative flow change = 0.000096
                        maximum  flow change = 0.8340 for Link P-272
                        maximum  head error  = 0.0010 for Link P-272

    14:38:36: Balanced after 6 trials
    14:38:36: Tank T-12 is closed at 148.36 ft
    14:38:36: Pipe P-5 changed from open to temporarily closed
   
    15:00:00: Balancing the network:

              Trial  1: relative flow change = 0.004066
              Trial  2: relative flow change = 0.000381
              Trial  3: relative flow change = 0.000010
                        maximum  flow change = 0.0604 for Link P-814
                        maximum  head error  = 0.0000 for Link P-814

    15:00:00: Balanced after 3 trials
   
    16:00:00: Balancing the network:

              Trial  1: relative flow change = 0.013360
              Trial  2: relative flow change = 0.003018
              Trial  3: relative flow change = 0.000032
                        maximum  flow change = 0.0716 for Link P-785
                        maximum  head error  = 0.0000 for Link P-814

    16:00:00: Balanced after 3 trials
   
    17:00:00: Balancing the network:

              Trial  1: relative flow change = 0.037394
              Trial  2: relative flow change = 0.007188
              PRV ~@RV-4 switched from active to open
              Trial  3: relative flow change = 0.000691
              Trial  4: relative flow change = 0.000047
                        maximum  flow change = 0.3527 for Link P-814
                        maximum  head error  = 0.0007 for Link P-814

    17:00:00: Balanced after 4 trials
    17:00:00: Tank T-4 is emptying at 80.85 ft
    17:00:00: PRV ~@RV-4 changed from active to open
   
    18:00:00: Balancing the network:

              Trial  1: relative flow change = 0.068693
              Trial  2: relative flow change = 0.001887
              Trial  3: relative flow change = 0.000024
                        maximum  flow change = 0.2556 for Link P-867
                        maximum  head error  = 0.0000 for Link P-85

    18:00:00: Balanced after 3 trials
   
    18:08:30: Pump ~@Pump-13 changed by Tank T-1 control
    18:08:30: Balancing the network:

              Trial  1: relative flow change = 0.035853
              Trial  2: relative flow change = 0.073522
              Trial  3: relative flow change = 0.023662
              Trial  4: relative flow change = 0.017348
              Trial  5: relative flow change = 0.004268
              Trial  6: relative flow change = 0.000119
              Trial  7: relative flow change = 0.000000
                        maximum  flow change = 0.0011 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-13

    18:08:30: Balanced after 7 trials
    18:08:30: Tank T-1 is filling at 130.78 ft
    18:08:30: Pump ~@Pump-13 changed from closed to open
   
    19:00:00: Balancing the network:

              Trial  1: relative flow change = 0.072217
              Trial  2: relative flow change = 0.002197
              Trial  3: relative flow change = 0.000015
                        maximum  flow change = 0.0404 for Link P-747
                        maximum  head error  = 0.0000 for Link P-601

    19:00:00: Balanced after 3 trials
    19:00:00: Tank T-1 is emptying at 130.81 ft
   
    20:00:00: Balancing the network:

              Trial  1: relative flow change = 0.019907
              Trial  2: relative flow change = 0.000487
              Trial  3: relative flow change = 0.000001
                        maximum  flow change = 0.0137 for Link P-675
                        maximum  head error  = 0.0000 for Link P-1001

    20:00:00: Balanced after 3 trials
   
    20:52:41: Balancing the network:

              Trial  1: relative flow change = 0.010185
              Trial  2: relative flow change = 0.000366
              Pipe P-1030 switched from closed to open
              Pipe P-9 switched from open to closed
              Trial  3: relative flow change = 0.092524
              PRV ~@RV-1 switched from closed to open
              Trial  4: relative flow change = 0.012253
              Trial  5: relative flow change = 0.001944
              Trial  6: relative flow change = 0.000616
              Trial  7: relative flow change = 0.000133
              Trial  8: relative flow change = 0.000008
                        maximum  flow change = 0.0663 for Link P-692
                        maximum  head error  = 0.0001 for Link P-55

    20:52:41: Balanced after 8 trials
    20:52:41: Tank T-11 is emptying at 106.61 ft
    20:52:41: Tank T-13 is closed at 65.48 ft
    20:52:41: Pipe P-1030 changed from temporarily closed to open
    20:52:41: Pipe P-9 changed from open to temporarily closed
    20:52:41: PRV ~@RV-1 changed from closed to open
   
  WARNING: Negative pressures at 20:52:41 hrs.
   
    21:00:00: Balancing the network:

              Trial  1: relative flow change = 0.042261
              Trial  2: relative flow change = 0.000739
              Trial  3: relative flow change = 0.000007
                        maximum  flow change = 0.0756 for Link P-85
                        maximum  head error  = 0.0000 for Link P-85

    21:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 21:00:00 hrs.
   
    22:00:00: Balancing the network:

              Trial  1: relative flow change = 0.585400
              PRV ~@RV-1 switched from open to active
              PRV ~@RV-2 switched from open to active
              PRV ~@RV-4 switched from open to active
              PRV ~@RV-5 switched from open to active
              Trial  2: relative flow change = 0.094641
              PRV ~@RV-2 switched from active to open
              Trial  3: relative flow change = 0.064698
              PRV ~@RV-1 switched from active to closed
              PRV ~@RV-5 switched from active to open
              Trial  4: relative flow change = 0.071641
              Pipe P-9 switched from closed to open
              Trial  5: relative flow change = 0.038768
              Trial  6: relative flow change = 0.003677
              Trial  7: relative flow change = 0.000134
              Trial  8: relative flow change = 0.000001
                        maximum  flow change = 0.0017 for Link P-451
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    22:00:00: Balanced after 8 trials
    22:00:00: Tank T-1 is filling at 130.20 ft
    22:00:00: Tank T-11 is filling at 106.59 ft
    22:00:00: Tank T-13 is filling at 65.48 ft
    22:00:00: Tank T-4 is filling at 78.64 ft
    22:00:00: Pipe P-9 changed from temporarily closed to open
    22:00:00: PRV ~@RV-1 changed from open to closed
    22:00:00: PRV ~@RV-4 changed from open to active
   
    22:01:27: Balancing the network:

              Trial  1: relative flow change = 0.000100
              Trial  2: relative flow change = 0.000009
                        maximum  flow change = 0.0157 for Link P-783
                        maximum  head error  = 0.0000 for Link ~@Pump-11

              Pipe P-1030 switched from open to closed
              Trial  3: relative flow change = 0.007384
              Trial  4: relative flow change = 0.001195
              Trial  5: relative flow change = 0.000049
                        maximum  flow change = 0.2934 for Link P-389
                        maximum  head error  = 0.0002 for Link P-145

    22:01:27: Balanced after 5 trials
    22:01:27: Tank T-11 is closed at 106.61 ft
    22:01:27: Pipe P-1030 changed from open to temporarily closed
   
    22:09:40: Balancing the network:

              Trial  1: relative flow change = 0.000444
              Trial  2: relative flow change = 0.000053
                        maximum  flow change = 0.0891 for Link P-783
                        maximum  head error  = 0.0000 for Link ~@Pump-11

              Pipe P-630 switched from open to closed
              Pipe P-881 switched from open to closed
              Trial  3: relative flow change = 0.203129
              Trial  4: relative flow change = 0.018026
              PRV ~@RV-4 switched from active to open
              Trial  5: relative flow change = 0.003011
              Trial  6: relative flow change = 0.000189
              Trial  7: relative flow change = 0.000005
                        maximum  flow change = 0.0156 for Link P-624
                        maximum  head error  = 0.0000 for Link P-624

    22:09:40: Balanced after 7 trials
    22:09:40: Tank T-5 is closed at 124.36 ft
    22:09:40: Pipe P-630 changed from open to temporarily closed
    22:09:40: Pipe P-881 changed from open to temporarily closed
    22:09:40: PRV ~@RV-4 changed from active to open
   
    23:00:00: Balancing the network:

              Trial  1: relative flow change = 0.293262
              PRV ~@RV-2 switched from open to active
              PRV ~@RV-4 switched from open to active
              Trial  2: relative flow change = 0.035814
              Trial  3: relative flow change = 0.016049
              Trial  4: relative flow change = 0.001300
              Trial  5: relative flow change = 0.000073
                        maximum  flow change = 0.1869 for Link P-192
                        maximum  head error  = 0.0000 for Link P-192

    23:00:00: Balanced after 5 trials
    23:00:00: Tank T-10 is filling at 171.61 ft
    23:00:00: PRV ~@RV-2 changed from open to active
    23:00:00: PRV ~@RV-4 changed from open to active
   
    24:00:00: Balancing the network:

              Trial  1: relative flow change = 0.095329
              PRV ~@RV-5 switched from open to active
              Trial  2: relative flow change = 0.021101
              Trial  3: relative flow change = 0.005925
              Trial  4: relative flow change = 0.000309
              Trial  5: relative flow change = 0.000010
                        maximum  flow change = 0.0506 for Link P-633
                        maximum  head error  = 0.0000 for Link P-633

    24:00:00: Balanced after 5 trials
    24:00:00: Tank T-6 is filling at 102.64 ft
    24:00:00: PRV ~@RV-5 changed from open to active
   
    25:00:00: Balancing the network:

              Trial  1: relative flow change = 0.045964
              Trial  2: relative flow change = 0.009908
              Trial  3: relative flow change = 0.001286
              Trial  4: relative flow change = 0.000013
                        maximum  flow change = 0.0230 for Link P-976
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    25:00:00: Balanced after 4 trials
   
    26:00:00: Balancing the network:

              Trial  1: relative flow change = 0.022138
              Trial  2: relative flow change = 0.005755
              Pipe P-5 switched from closed to open
              Trial  3: relative flow change = 0.001141
              Trial  4: relative flow change = 0.000274
              Trial  5: relative flow change = 0.000011
                        maximum  flow change = 0.0153 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    26:00:00: Balanced after 5 trials
    26:00:00: Tank T-12 is filling at 148.36 ft
    26:00:00: Pipe P-5 changed from temporarily closed to open
   
    27:00:00: Balancing the network:

              Trial  1: relative flow change = 0.003514
              Trial  2: relative flow change = 0.001227
              Trial  3: relative flow change = 0.000030
                        maximum  flow change = 0.0415 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    27:00:00: Balanced after 3 trials
   
    27:16:49: Pump ~@Pump-9 changed by Tank T-4 control
    27:16:49: Balancing the network:

              Trial  1: relative flow change = 0.187124
              Trial  2: relative flow change = 0.005712
              Pipe P-630 switched from closed to open
              Pipe P-881 switched from closed to open
              Trial  3: relative flow change = 0.038525
              Trial  4: relative flow change = 0.003568
              Trial  5: relative flow change = 0.000236
              Trial  6: relative flow change = 0.000048
                        maximum  flow change = 2.5215 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link P-833

    27:16:49: Balanced after 6 trials
    27:16:49: Tank T-4 is emptying at 84.61 ft
    27:16:49: Tank T-5 is filling at 124.36 ft
    27:16:49: Pipe P-630 changed from temporarily closed to open
    27:16:49: Pipe P-881 changed from temporarily closed to open
    27:16:49: Pump ~@Pump-9 changed from open to closed
   
    28:00:00: Balancing the network:

              Trial  1: relative flow change = 0.028628
              Trial  2: relative flow change = 0.003724
              Trial  3: relative flow change = 0.000684
              Trial  4: relative flow change = 0.000007
                        maximum  flow change = 0.1576 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    28:00:00: Balanced after 4 trials
    28:00:00: Tank T-12 is emptying at 148.43 ft
   
    29:00:00: Balancing the network:

              Trial  1: relative flow change = 0.050929
              Trial  2: relative flow change = 0.008567
              Trial  3: relative flow change = 0.001373
              Trial  4: relative flow change = 0.000008
                        maximum  flow change = 0.0098 for Link ~@Pump-9
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    29:00:00: Balanced after 4 trials
   
    29:04:25: Balancing the network:

              Trial  1: relative flow change = 0.000709
              Trial  2: relative flow change = 0.000080
                        maximum  flow change = 0.0935 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-10

              Pipe P-5 switched from open to closed
              Trial  3: relative flow change = 0.011111
              Trial  4: relative flow change = 0.002866
              Trial  5: relative flow change = 0.000119
              Trial  6: relative flow change = 0.000002
                        maximum  flow change = 0.0027 for Link P-512
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    29:04:25: Balanced after 6 trials
    29:04:25: Tank T-12 is closed at 148.36 ft
    29:04:25: Pipe P-5 changed from open to temporarily closed
   
    30:00:00: Balancing the network:

              Trial  1: relative flow change = 0.088700
              Trial  2: relative flow change = 0.021898
              Trial  3: relative flow change = 0.002545
              Trial  4: relative flow change = 0.000034
                        maximum  flow change = 0.0615 for Link P-808
                        maximum  head error  = 0.0000 for Link P-974

    30:00:00: Balanced after 4 trials
    30:00:00: Tank T-5 is emptying at 124.61 ft
   
    31:00:00: Balancing the network:

              Trial  1: relative flow change = 0.188667
              PRV ~@RV-2 switched from active to open
              PRV ~@RV-5 switched from active to open
              Trial  2: relative flow change = 0.056691
              Trial  3: relative flow change = 0.009434
              Trial  4: relative flow change = 0.000726
              Trial  5: relative flow change = 0.000079
                        maximum  flow change = 0.6467 for Link P-821
                        maximum  head error  = 0.0002 for Link P-821

    31:00:00: Balanced after 5 trials
    31:00:00: Tank T-10 is emptying at 174.40 ft
    31:00:00: Tank T-6 is emptying at 108.43 ft
    31:00:00: PRV ~@RV-2 changed from active to open
    31:00:00: PRV ~@RV-5 changed from active to open
   
    32:00:00: Balancing the network:

              Trial  1: relative flow change = 0.137078
              Trial  2: relative flow change = 0.024012
              PRV ~@RV-4 switched from active to open
              Trial  3: relative flow change = 0.011099
              Trial  4: relative flow change = 0.000139
              Trial  5: relative flow change = 0.000001
                        maximum  flow change = 0.0010 for Link P-310
                        maximum  head error  = 0.0000 for Link P-200

    32:00:00: Balanced after 5 trials
    32:00:00: Tank T-13 is emptying at 89.13 ft
    32:00:00: PRV ~@RV-4 changed from active to open
   
    32:05:38: Balancing the network:

              Trial  1: relative flow change = 0.001064
              Trial  2: relative flow change = 0.000003
                        maximum  flow change = 0.0111 for Link P-718
                        maximum  head error  = 0.0000 for Link P-601

              Pipe P-630 switched from open to closed
              Pipe P-881 switched from open to closed
              Trial  3: relative flow change = 0.106063
              Trial  4: relative flow change = 0.005137
              Trial  5: relative flow change = 0.000546
              Trial  6: relative flow change = 0.000049
                        maximum  flow change = 0.2307 for Link P-814
                        maximum  head error  = 0.0003 for Link P-814

    32:05:38: Balanced after 6 trials
    32:05:38: Tank T-5 is closed at 124.36 ft
    32:05:38: Pipe P-630 changed from open to temporarily closed
    32:05:38: Pipe P-881 changed from open to temporarily closed
   
    32:47:18: Pump ~@Pump-9 changed by Tank T-4 control
    32:47:18: Balancing the network:

              Trial  1: relative flow change = 0.090507
              Trial  2: relative flow change = 0.190371
              Trial  3: relative flow change = 0.014063
              Trial  4: relative flow change = 0.001564
              Trial  5: relative flow change = 0.000278
              Trial  6: relative flow change = 0.000017
                        maximum  flow change = 0.0973 for Link P-814
                        maximum  head error  = 0.0000 for Link P-814

    32:47:18: Balanced after 6 trials
    32:47:18: Pump ~@Pump-9 changed from closed to open
   
    33:00:00: Balancing the network:

              Trial  1: relative flow change = 0.048146
              Trial  2: relative flow change = 0.001207
              Trial  3: relative flow change = 0.000002
                        maximum  flow change = 0.0067 for Link P-59
                        maximum  head error  = 0.0000 for Link P-445

    33:00:00: Balanced after 3 trials
   
    34:00:00: Balancing the network:

              Trial  1: relative flow change = 0.015404
              Trial  2: relative flow change = 0.000354
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0004 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-9

    34:00:00: Balanced after 3 trials
   
    35:00:00: Balancing the network:

              Trial  1: relative flow change = 0.007130
              Trial  2: relative flow change = 0.000079
                        maximum  flow change = 0.1870 for Link P-650
                        maximum  head error  = 0.0000 for Link ~@Pump-3

    35:00:00: Balanced after 2 trials
   
    35:32:06: Balancing the network:

              Trial  1: relative flow change = 0.003781
              Trial  2: relative flow change = 0.000023
                        maximum  flow change = 0.0606 for Link P-650
                        maximum  head error  = 0.0000 for Link ~@Pump-3

              Pipe P-512 switched from open to closed
              Trial  3: relative flow change = 0.341853
              Trial  4: relative flow change = 0.069561
              Pipe P-596 switched from closed to open
              Trial  5: relative flow change = 0.172711
              Trial  6: relative flow change = 0.032764
              Trial  7: relative flow change = 0.002604
              Trial  8: relative flow change = 0.000055
                        maximum  flow change = 0.5190 for Link P-102
                        maximum  head error  = 0.0004 for Link P-728

    35:32:06: Balanced after 8 trials
    35:32:06: Tank T-1 is emptying at 140.58 ft
    35:32:06: Tank T-2 is emptying at 97.67 ft
    35:32:06: Tank T-6 is closed at 97.72 ft
    35:32:06: Pipe P-512 changed from open to temporarily closed
    35:32:06: Pipe P-596 changed from temporarily closed to open
   
  WARNING: Negative pressures at 35:32:06 hrs.
   
    36:00:00: Balancing the network:

              Trial  1: relative flow change = 0.011030
              Trial  2: relative flow change = 0.000140
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0009 for Link P-1015
                        maximum  head error  = 0.0000 for Link P-728

    36:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 36:00:00 hrs.
   
    37:00:00: Balancing the network:

              Trial  1: relative flow change = 0.027833
              Trial  2: relative flow change = 0.000514
              Trial  3: relative flow change = 0.000005
                        maximum  flow change = 0.0741 for Link P-728
                        maximum  head error  = 0.0000 for Link P-728

    37:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 37:00:00 hrs.
   
    38:00:00: Balancing the network:

              Trial  1: relative flow change = 0.013077
              Trial  2: relative flow change = 0.000197
              Trial  3: relative flow change = 0.000006
                        maximum  flow change = 0.0915 for Link P-728
                        maximum  head error  = 0.0000 for Link P-728

    38:00:00: Balanced after 3 trials
    38:00:00: Tank T-1 is closed at 140.47 ft
   
  WARNING: Negative pressures at 38:00:00 hrs.
   
    39:00:00: Balancing the network:

              Trial  1: relative flow change = 0.004354
              Trial  2: relative flow change = 0.000039
                        maximum  flow change = 0.1945 for Link P-728
                        maximum  head error  = 0.0001 for Link P-728

    39:00:00: Balanced after 2 trials
   
  WARNING: Negative pressures at 39:00:00 hrs.
   
    40:00:00: Balancing the network:

              Trial  1: relative flow change = 0.011415
              Trial  2: relative flow change = 0.000249
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0004 for Link P-310
                        maximum  head error  = 0.0000 for Link P-211

    40:00:00: Balanced after 3 trials
    40:00:00: Tank T-1 is emptying at 140.47 ft
   
  WARNING: Negative pressures at 40:00:00 hrs.
   
    41:00:00: Balancing the network:

              Trial  1: relative flow change = 0.039683
              Trial  2: relative flow change = 0.001082
              Pipe P-1030 switched from closed to open
              Trial  3: relative flow change = 0.000019
                        maximum  flow change = 0.2860 for Link P-728
                        maximum  head error  = 0.0002 for Link P-728

    41:00:00: Balanced after 3 trials
    41:00:00: Pipe P-1030 changed from temporarily closed to open
   
  WARNING: Negative pressures at 41:00:00 hrs.
   
    41:14:39: Balancing the network:

              Trial  1: relative flow change = 0.001191
              Trial  2: relative flow change = 0.000006
                        maximum  flow change = 0.0647 for Link P-728
                        maximum  head error  = 0.0000 for Link P-211

              Pipe P-3 switched from open to closed
              Trial  3: relative flow change = 0.042807
              PRV ~@RV-3 switched from active to open
              Trial  4: relative flow change = 0.000318
              Trial  5: relative flow change = 0.000039
                        maximum  flow change = 0.6385 for Link P-728
                        maximum  head error  = 0.0007 for Link P-728

    41:14:39: Balanced after 5 trials
    41:14:39: Tank T-11 is emptying at 106.61 ft
    41:14:39: Tank T-4 is closed at 74.61 ft
    41:14:39: Pipe P-3 changed from open to temporarily closed
    41:14:39: PRV ~@RV-3 changed from active to open
   
  WARNING: Negative pressures at 41:14:39 hrs.
   
    42:00:00: Balancing the network:

              Trial  1: relative flow change = 0.072882
              Trial  2: relative flow change = 0.001300
              Trial  3: relative flow change = 0.000007
                        maximum  flow change = 0.0806 for Link P-102
                        maximum  head error  = 0.0000 for Link P-728

    42:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 42:00:00 hrs.
   
    43:00:00: Balancing the network:

              Trial  1: relative flow change = 0.080813
              Trial  2: relative flow change = 0.001845
              Trial  3: relative flow change = 0.000008
                        maximum  flow change = 0.0355 for Link P-1015
                        maximum  head error  = 0.0000 for Link ~@Pump-2

    43:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 43:00:00 hrs.
   
    44:00:00: Balancing the network:

              Trial  1: relative flow change = 0.019040
              Trial  2: relative flow change = 0.000203
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0006 for Link P-310
                        maximum  head error  = 0.0000 for Link ~@Pump-2

    44:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 44:00:00 hrs.
   
    44:02:39: Balancing the network:

              Trial  1: relative flow change = 0.000242
              Trial  2: relative flow change = 0.000000
                        maximum  flow change = 0.0012 for Link P-1015
                        maximum  head error  = 0.0000 for Link P-783

              Pipe P-596 switched from open to closed
              Trial  3: relative flow change = 0.164426
              Trial  4: relative flow change = 0.014336
              Trial  5: relative flow change = 0.000785
              Trial  6: relative flow change = 0.000039
                        maximum  flow change = 0.4455 for Link P-102
                        maximum  head error  = 0.0001 for Link P-102

    44:02:39: Balanced after 6 trials
    44:02:39: Tank T-2 is closed at 72.67 ft
    44:02:39: Pipe P-596 changed from open to temporarily closed
   
  WARNING: Negative pressures at 44:02:39 hrs.
   
    45:00:00: Balancing the network:

              Trial  1: relative flow change = 0.033425
              Trial  2: relative flow change = 0.000152
              Trial  3: relative flow change = 0.000000
                        maximum  flow change = 0.0005 for Link P-108
                        maximum  head error  = 0.0000 for Link ~@Pump-13

    45:00:00: Balanced after 3 trials
   
  WARNING: Negative pressures at 45:00:00 hrs.
   
    46:00:00: Balancing the network:

              Trial  1: relative flow change = 0.447023
              PRV ~@RV-3 switched from open to active
              Trial  2: relative flow change = 0.029133
              Pipe P-3 switched from closed to open
              Trial  3: relative flow change = 0.003428
              Trial  4: relative flow change = 0.000056
                        maximum  flow change = 0.0837 for Link P-3
                        maximum  head error  = 0.0001 for Link ~@Pump-9

    46:00:00: Balanced after 4 trials
    46:00:00: Tank T-1 is filling at 138.14 ft
    46:00:00: Tank T-11 is filling at 104.64 ft
    46:00:00: Tank T-13 is filling at 69.87 ft
    46:00:00: Tank T-4 is filling at 74.61 ft
    46:00:00: Pipe P-3 changed from temporarily closed to open
    46:00:00: PRV ~@RV-3 changed from open to active
   
  WARNING: Negative pressures at 46:00:00 hrs.
   
    47:00:00: Balancing the network:

              Trial  1: relative flow change = 0.204045
              PRV ~@RV-2 switched from open to active
              PRV ~@RV-4 switched from open to active
              Trial  2: relative flow change = 0.030162
              Pipe P-512 switched from closed to open
              Pipe P-596 switched from closed to open
              Trial  3: relative flow change = 0.455978
              PRV ~@RV-4 switched from active to open
              Trial  4: relative flow change = 0.241783
              PRV ~@RV-4 switched from open to active
              Pipe P-512 switched from open to closed
              Trial  5: relative flow change = 0.324134
              PRV ~@RV-4 switched from active to open
              Trial  6: relative flow change = 0.063632
              PRV ~@RV-2 switched from active to open
              Trial  7: relative flow change = 0.011911
              Trial  8: relative flow change = 0.002594
              Trial  9: relative flow change = 0.000403
              Trial 10: relative flow change = 0.000049
                        maximum  flow change = 0.2625 for Link P-297
                        maximum  head error  = 0.0000 for Link P-297

    47:00:00: Balanced after 10 trials
    47:00:00: Tank T-2 is filling at 72.67 ft
    47:00:00: Pipe P-596 changed from temporarily closed to open
   
    48:00:00: Balancing the network:

              Trial  1: relative flow change = 0.090625
              PRV ~@RV-2 switched from open to active
              Trial  2: relative flow change = 0.004114
              Trial  3: relative flow change = 0.000039
                        maximum  flow change = 0.1208 for Link P-374
                        maximum  head error  = 0.0000 for Link P-145

    48:00:00: Balanced after 3 trials
    48:00:00: PRV ~@RV-2 changed from open to active
   
    49:00:00: Balancing the network:

              Trial  1: relative flow change = 0.047606
              PRV ~@RV-4 switched from open to active
              Trial  2: relative flow change = 0.007145
              Trial  3: relative flow change = 0.003200
              Trial  4: relative flow change = 0.000100
                        maximum  flow change = 0.2526 for Link P-89
                        maximum  head error  = 0.0001 for Link ~@Pump-11

    49:00:00: Balanced after 4 trials
    49:00:00: Tank T-10 is filling at 164.72 ft
    49:00:00: PRV ~@RV-4 changed from open to active
   
    49:24:54: Balancing the network:

              Trial  1: relative flow change = 0.001990
              Trial  2: relative flow change = 0.000216
              Pipe P-1030 switched from open to closed
              Trial  3: relative flow change = 0.005685
              Trial  4: relative flow change = 0.001000
              Trial  5: relative flow change = 0.000048
                        maximum  flow change = 0.1438 for Link P-444
                        maximum  head error  = 0.0001 for Link P-645

    49:24:54: Balanced after 5 trials
    49:24:54: Tank T-11 is closed at 106.61 ft
    49:24:54: Pipe P-1030 changed from open to temporarily closed
   
    50:00:00: Balancing the network:

              Trial  1: relative flow change = 0.020910
              Trial  2: relative flow change = 0.002760
              Trial  3: relative flow change = 0.000368
              Trial  4: relative flow change = 0.000010
                        maximum  flow change = 0.0246 for Link P-89
                        maximum  head error  = 0.0000 for Link ~@Pump-11

    50:00:00: Balanced after 4 trials
   